{
 "meta": {
  "title": "Candid Dragon data center map",
  "updated": "2026-11-15",
  "count": 102,
  "by_status": {
   "operating": 77,
   "construction": 21,
   "blocked": 1,
   "proposed": 3
  },
  "notes": "Most sites come from Epoch AI's Frontier Data Centers dataset (CC BY 4.0), which tracks large AI data centers using satellite imagery, permits and company statements. Power, cost and water figures for those sites are Epoch AI estimates. Figures after Nov. 2026 are projections. Sites marked \"reported\" come from the linked company statements, government pages or news reports. Locations are approximate.",
  "license": "Epoch AI data: CC BY 4.0. Candid Dragon additions: free to reuse with a link."
 },
 "sites": [
  {
   "id": "colossus-2",
   "name": "Colossus 2",
   "operator": "SpaceXAI",
   "users": "Anthropic, Cursor, SpaceXAI",
   "project": "",
   "lat": 34.998,
   "lng": -90.0349,
   "loc_precision": "address",
   "place": "5420 Tulane Rd, Memphis, TN 38109",
   "state": "Tennessee",
   "country": "United States",
   "status": "operating",
   "start_year": 2025,
   "open_year": 2025,
   "power_mw_now": 1276,
   "power_mw_full": 2065,
   "full_build_date": "2027-02",
   "capex_bn_full": 58.0,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "Power comes partly from gas turbines just over the state line in Southaven, Mississippi. In April 2026 the NAACP, represented by SELC and Earthjustice, sued xAI under the Clean Air Act, alleging the turbines run without permits. The case is pending.",
   "basis": "epoch",
   "sources": [
    {
     "t": "Southern Environmental Law Center, April 14, 2026",
     "u": "https://www.selc.org/news/xai-built-an-illegal-power-plant-to-power-its-data-center/"
    },
    {
     "t": "WSJ profile of the Colossus data centers",
     "u": "https://www.wsj.com/tech/elon-musk-xai-memphis-tennessee-power-dec4c70d"
    },
    {
     "t": "Final GPU count reported by Elon Musk",
     "u": "https://x.com/elonmusk/status/1947701807389515912"
    },
    {
     "t": "MLGW update mentioning power requests for Colossus 2",
     "u": "https://www.mlgw.com/images/content/files/pdf/new/5-5-25%20xAI%20Update.pdf#page=4"
    },
    {
     "t": "SpaceX-Cursor partnership to use Colossus",
     "u": "https://x.com/SpaceX/status/2046713419978453374"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2025": [
     "o",
     323
    ],
    "2026": [
     "o",
     1276
    ],
    "2027": [
     "o",
     2065
    ],
    "2028": [
     "o",
     2065
    ],
    "2029": [
     "o",
     2065
    ],
    "2030": [
     "o",
     2065
    ]
   }
  },
  {
   "id": "openai-stargate-abilene",
   "name": "OpenAI Stargate Abilene",
   "operator": "Oracle",
   "users": "OpenAI",
   "project": "Stargate",
   "lat": 32.4942,
   "lng": -99.8009,
   "loc_precision": "address",
   "place": "5502 Spinks Rd, Abilene, TX 79601",
   "state": "Texas",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2025,
   "power_mw_now": 1154,
   "power_mw_full": 1154,
   "full_build_date": "2026-11",
   "capex_bn_full": 31.2,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "Oracle said on Sept. 10, 2026 that six of eight buildings, 618 MW, had been delivered. The campus is planned at about 1.2 GW.",
   "basis": "epoch",
   "sources": [
    {
     "t": "OpenAI: five new Stargate sites (Sept. 2025)",
     "u": "https://openai.com/index/five-new-stargate-sites/"
    },
    {
     "t": "Mortensen’s profile of the project, with details of substations",
     "u": "https://www.mortenson.com/projects/abilene-data-center-development"
    },
    {
     "t": "Crusoe 2024 Impact Report, with details on Abilene",
     "u": "https://drive.google.com/file/d/1oHWA9vmpvFOh-LvDy5fgq_wq5ITuxd1r/view?usp=sharing"
    },
    {
     "t": "Air Permit Application for buildings 1-2, featuring blueprints on p.157",
     "u": "https://drive.google.com/file/d/1FgfX6hqojlBtqNXJHjzJmnwWAMx4_M0b/view?usp=sharing"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     288
    ],
    "2026": [
     "o",
     1154
    ],
    "2027": [
     "o",
     1154
    ],
    "2028": [
     "o",
     1154
    ],
    "2029": [
     "o",
     1154
    ],
    "2030": [
     "o",
     1154
    ]
   }
  },
  {
   "id": "anthropic-amazon-new-carlisle",
   "name": "Anthropic-Amazon New Carlisle",
   "operator": "Amazon",
   "users": "Anthropic",
   "project": "Project Rainier",
   "lat": 41.7057,
   "lng": -86.5098,
   "loc_precision": "city",
   "place": "55001 Larrison Blvd, New Carlisle, IN 46552",
   "state": "Indiana",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2025,
   "power_mw_now": 1244,
   "power_mw_full": 2310,
   "full_build_date": "2028-03",
   "capex_bn_full": 72.9,
   "water_mgd": 21.0,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Backup diesel generator referenced in the permit",
     "u": "https://www.cat.com/en_US/products/new/power-systems/electric-power/diesel-generator-sets/117341.html"
    },
    {
     "t": "Announcement of Project Rainier coming online",
     "u": "https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster"
    },
    {
     "t": "Air Construction Permit application for the northern portion",
     "u": "https://drive.google.com/file/d/1BKiTFNUk2KDaUaiHG7fz0KlkNSBTHzbb/view?usp=sharing"
    },
    {
     "t": "Air permit for Buildings 19-32, suggesting expansion to 2.3 GW total facility power",
     "u": "https://t.co/HsAO7oyKa2"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     751
    ],
    "2026": [
     "o",
     1244
    ],
    "2027": [
     "o",
     1244
    ],
    "2028": [
     "o",
     2310
    ],
    "2029": [
     "o",
     2310
    ],
    "2030": [
     "o",
     2310
    ]
   }
  },
  {
   "id": "microsoft-fairwater-atlanta",
   "name": "Microsoft Fairwater Atlanta",
   "operator": "Microsoft",
   "users": "OpenAI, Microsoft",
   "project": "Microsoft AI WAN",
   "lat": 33.4455,
   "lng": -84.5241,
   "loc_precision": "address",
   "place": "1435 Hwy 54 W, Fayetteville, GA 30214",
   "state": "Georgia",
   "country": "United States",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2025,
   "power_mw_now": 859,
   "power_mw_full": 859,
   "full_build_date": "2026-06",
   "capex_bn_full": 24.1,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "YouTube video with aerial views",
     "u": "https://www.youtube.com/watch?v=44eWesI-174"
    },
    {
     "t": "OpenAI article mentioning they use Microsoft's Fairwater supercomputers",
     "u": "https://openai.com/index/mrc-supercomputer-networking/"
    },
    {
     "t": "Bloomberg article",
     "u": "https://www.bloomberg.com/news/features/2024-12-08/georgia-s-blackstone-backed-qts-data-center-hits-resistance-over-ai-power-needs"
    },
    {
     "t": "2023 Air Permit application",
     "u": "https://drive.google.com/file/d/1p7aY9syz319IcEuyukgIIvzmhTNKRS6p/view?usp=sharing"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     433
    ],
    "2026": [
     "o",
     859
    ],
    "2027": [
     "o",
     859
    ],
    "2028": [
     "o",
     859
    ],
    "2029": [
     "o",
     859
    ],
    "2030": [
     "o",
     859
    ]
   }
  },
  {
   "id": "google-pryor-north",
   "name": "Google Pryor (North)",
   "operator": "Google",
   "users": "Google DeepMind",
   "project": "",
   "lat": 36.3084,
   "lng": -95.3169,
   "loc_precision": "city/county",
   "place": "4581 Webb St, Pryor, OK 74361",
   "state": "Oklahoma",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2024,
   "power_mw_now": 442,
   "power_mw_full": 442,
   "full_build_date": "2026-09",
   "capex_bn_full": 13.9,
   "water_mgd": 2.283,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Google announces expansion of Pryor facility",
     "u": "https://blog.google/inside-google/company-announcements/google-american-innovation-oklahoma/"
    },
    {
     "t": "Google 2025 Environmental Report",
     "u": "https://sustainability.google/reports/google-2025-environmental-report/"
    },
    {
     "t": "News of a 9 exaflop TPUv4 cluster in the Pryor data center, launched in 2022",
     "u": "https://techcrunch.com/2022/05/11/google-launches-a-9-exaflop-cluster-of-cloud-tpu-v4-pods-into-public-preview/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "o",
     63
    ],
    "2025": [
     "o",
     63
    ],
    "2026": [
     "o",
     442
    ],
    "2027": [
     "o",
     442
    ],
    "2028": [
     "o",
     442
    ],
    "2029": [
     "o",
     442
    ],
    "2030": [
     "o",
     442
    ]
   }
  },
  {
   "id": "dayone-nusajaya",
   "name": "DayOne Nusajaya",
   "operator": "",
   "users": "",
   "project": "",
   "lat": 1.4494,
   "lng": 103.6153,
   "loc_precision": "city/county",
   "place": "Nusajaya, Johor, Malaysia",
   "state": "",
   "country": "Malaysia",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2024,
   "power_mw_now": 662,
   "power_mw_full": 662,
   "full_build_date": "2026-10",
   "capex_bn_full": 17.9,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "News of Phase 2 operation",
     "u": "https://www.moomoo.com/news/post/41886329/support-ai-computing-deployment-gds-holdings-nusajaya-technology-park-datacenter?level=1&data_ticket=1778269491837872"
    },
    {
     "t": "Archived DayOne website - \"120 MW in operation\" in Johor",
     "u": "https://web.archive.org/web/20241231165420/https://dayonedc.com/"
    },
    {
     "t": "Archived DayOne website - 390 MW \"in service\" in Johor",
     "u": "https://web.archive.org/web/20260314134756/https://dayonedc.com/market/johor"
    },
    {
     "t": "Financial Times report that Alibaba and ByteDance are training AI models in southeast Asia",
     "u": "https://www.ft.com/content/96fe9898-a3a4-4a33-be1d-da06bdb6cb2b"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "o",
     70
    ],
    "2025": [
     "o",
     70
    ],
    "2026": [
     "o",
     662
    ],
    "2027": [
     "o",
     662
    ],
    "2028": [
     "o",
     662
    ],
    "2029": [
     "o",
     662
    ],
    "2030": [
     "o",
     662
    ]
   }
  },
  {
   "id": "meta-prometheus",
   "name": "Meta Prometheus",
   "operator": "Meta",
   "users": "Meta",
   "project": "Prometheus",
   "lat": 40.0812,
   "lng": -82.8088,
   "loc_precision": "city",
   "place": "1 Community Cir, New Albany, OH 43054",
   "state": "Ohio",
   "country": "United States",
   "status": "operating",
   "start_year": 2022,
   "open_year": 2025,
   "power_mw_now": 612,
   "power_mw_full": 1328,
   "full_build_date": "2028-07",
   "capex_bn_full": 38.7,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Meta blog post with details on Prometheus",
     "u": "https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/"
    },
    {
     "t": "New Albany Business Park land use map",
     "u": "https://drive.google.com/file/d/1Wb_BBVOnhu5UCQ8Q5d6iRIG9K_vigD8A/view?usp=sharing"
    },
    {
     "t": "Letter on Socrates South Power Generation Project",
     "u": "https://drive.google.com/file/d/1OMbFbdNGPmfSkwVWqOAK-5pOufiKQBu1/view?usp=sharing"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     99
    ],
    "2026": [
     "o",
     878
    ],
    "2027": [
     "o",
     1128
    ],
    "2028": [
     "o",
     1328
    ],
    "2029": [
     "o",
     1328
    ],
    "2030": [
     "o",
     1328
    ]
   }
  },
  {
   "id": "dayone-kempas",
   "name": "DayOne Kempas",
   "operator": "",
   "users": "",
   "project": "",
   "lat": 1.5288,
   "lng": 103.7051,
   "loc_precision": "city/county",
   "place": "HP79+MP, 81300 Johor Bahru, Johor, Malaysia",
   "state": "",
   "country": "Malaysia",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2026,
   "power_mw_now": 590,
   "power_mw_full": 590,
   "full_build_date": "2026-10",
   "capex_bn_full": 16.0,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "News of Phase 2 operation",
     "u": "https://www.moomoo.com/news/post/41886329/support-ai-computing-deployment-gds-holdings-nusajaya-technology-park-datacenter?level=1&data_ticket=1778269491837872"
    },
    {
     "t": "Archived DayOne website - \"120 MW in operation\" in Johor",
     "u": "https://web.archive.org/web/20241231165420/https://dayonedc.com/"
    },
    {
     "t": "Archived DayOne website - 390 MW \"in service\" in Johor",
     "u": "https://web.archive.org/web/20260314134756/https://dayonedc.com/market/johor"
    },
    {
     "t": "Financial Times report that Alibaba and ByteDance are training AI models in southeast Asia",
     "u": "https://www.ft.com/content/96fe9898-a3a4-4a33-be1d-da06bdb6cb2b"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     590
    ],
    "2027": [
     "o",
     590
    ],
    "2028": [
     "o",
     590
    ],
    "2029": [
     "o",
     590
    ],
    "2030": [
     "o",
     590
    ]
   }
  },
  {
   "id": "microsoft-fairwater-wisconsin",
   "name": "Microsoft Fairwater Wisconsin",
   "operator": "Microsoft",
   "users": "OpenAI, Microsoft",
   "project": "Microsoft AI WAN",
   "lat": 42.6749,
   "lng": -87.8949,
   "loc_precision": "address",
   "place": "4800 90th St, Mount Pleasant, WI 53403",
   "state": "Wisconsin",
   "country": "United States",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2026,
   "power_mw_now": 442,
   "power_mw_full": 2715,
   "full_build_date": "2028-05",
   "capex_bn_full": 85.7,
   "water_mgd": 0.008,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Microsoft blog with engineering details",
     "u": "https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/"
    },
    {
     "t": "Microsoft blog with more general information",
     "u": "https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/"
    },
    {
     "t": "OpenAI article mentioning they use Microsoft's Fairwater supercomputers",
     "u": "https://openai.com/index/mrc-supercomputer-networking/"
    },
    {
     "t": "Construction Permit Application for building 1",
     "u": "https://drive.google.com/file/d/1azyXnreQBuYEqX2oaSUgePDGCMneez5Z/view?usp=sharing"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     442
    ],
    "2027": [
     "o",
     885
    ],
    "2028": [
     "o",
     2715
    ],
    "2029": [
     "o",
     2715
    ],
    "2030": [
     "o",
     2715
    ]
   }
  },
  {
   "id": "google-columbus",
   "name": "Google Columbus",
   "operator": "Google",
   "users": "Google DeepMind",
   "project": "",
   "lat": 39.8615,
   "lng": -83.004,
   "loc_precision": "address",
   "place": "5076 S High St, Columbus, OH 43207",
   "state": "Ohio",
   "country": "United States",
   "status": "operating",
   "start_year": 2021,
   "open_year": 2024,
   "power_mw_now": 364,
   "power_mw_full": 464,
   "full_build_date": "2027-07",
   "capex_bn_full": 14.6,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "DCD article detailing early work beginning on the site ",
     "u": "https://www.datacenterdynamics.com/en/news/google-breaks-ground-on-columbus-ohio-data-center/"
    },
    {
     "t": "Transmission line construction notice; details current site capacity, expansion, and maximum future site capacity ",
     "u": "https://www.aeptransmission.com/ohio/docs/Hartman%20Farms%20Extension%20No.%202%20138%20kV%20Transmission%20Line%20Project%20Construction%20Notice.pdf"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2021": [
     "c",
     0
    ],
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "o",
     78
    ],
    "2025": [
     "o",
     260
    ],
    "2026": [
     "o",
     364
    ],
    "2027": [
     "o",
     464
    ],
    "2028": [
     "o",
     464
    ],
    "2029": [
     "o",
     464
    ],
    "2030": [
     "o",
     464
    ]
   }
  },
  {
   "id": "google-new-albany",
   "name": "Google New Albany",
   "operator": "Google",
   "users": "Google DeepMind",
   "project": "",
   "lat": 40.0701,
   "lng": -82.754,
   "loc_precision": "address",
   "place": "1101 Beech Rd SW, New Albany, OH 43054",
   "state": "Ohio",
   "country": "United States",
   "status": "operating",
   "start_year": 2021,
   "open_year": 2024,
   "power_mw_now": 400,
   "power_mw_full": 400,
   "full_build_date": "2025-10",
   "capex_bn_full": 12.6,
   "water_mgd": 0.966,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "2025 Environmental Report",
     "u": "https://sustainability.google/reports/google-2025-environmental-report/"
    },
    {
     "t": "Draft basis of air permit for Google Omaha, a similar data center",
     "u": "https://drive.google.com/file/d/1KN7o-wQOyt1UEud8wpM8PymXJF479r0n/view?usp=sharing"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2021": [
     "c",
     0
    ],
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "o",
     173
    ],
    "2025": [
     "o",
     400
    ],
    "2026": [
     "o",
     400
    ],
    "2027": [
     "o",
     400
    ],
    "2028": [
     "o",
     400
    ],
    "2029": [
     "o",
     400
    ],
    "2030": [
     "o",
     400
    ]
   }
  },
  {
   "id": "anthropic-lake-mariner",
   "name": "Anthropic Lake Mariner",
   "operator": "AI XPV Platform",
   "users": "Anthropic",
   "project": "",
   "lat": 43.3587,
   "lng": -78.6041,
   "loc_precision": "address",
   "place": "7725 Lake Rd, Barker, NY 14012",
   "state": "New York",
   "country": "United States",
   "status": "operating",
   "start_year": 2025,
   "open_year": 2026,
   "power_mw_now": 245,
   "power_mw_full": 441,
   "full_build_date": "2027-03",
   "capex_bn_full": 14.3,
   "water_mgd": 0.0,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Terawulf press release with details and timeline for Buildings 1-5",
     "u": "https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results"
    },
    {
     "t": "DCD article suggesting that Fluidstack will deploy Google TPUs at Lake Mariner",
     "u": "https://www.datacenterdynamics.com/en/news/google-offers-its-tpus-to-ai-cloud-providers-report/"
    },
    {
     "t": "Announcement of Anthropic-Fluidstack partnership, including data center(s) in New York",
     "u": "https://www.anthropic.com/news/anthropic-invests-50-billion-in-american-ai-infrastructure"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     245
    ],
    "2027": [
     "o",
     441
    ],
    "2028": [
     "o",
     441
    ],
    "2029": [
     "o",
     441
    ],
    "2030": [
     "o",
     441
    ]
   }
  },
  {
   "id": "google-mesa",
   "name": "Google Mesa",
   "operator": "Google",
   "users": "",
   "project": "",
   "lat": 33.4151,
   "lng": -111.8315,
   "loc_precision": "city/county",
   "place": "Mesa, Arizona",
   "state": "Arizona",
   "country": "United States",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2025,
   "power_mw_now": 237,
   "power_mw_full": 237,
   "full_build_date": "2026-08",
   "capex_bn_full": 6.9,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "DCD article on the site breaking ground",
     "u": "https://www.datacenterdynamics.com/en/news/google-breaks-ground-on-mesa-data-center-campus-in-arizona/"
    },
    {
     "t": "DCD article on announcement to build Building 2",
     "u": "https://www.datacenterdynamics.com/en/news/google-files-to-build-second-data-center-at-mesa-campus-in-arizona/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     126
    ],
    "2026": [
     "o",
     237
    ],
    "2027": [
     "o",
     237
    ],
    "2028": [
     "o",
     237
    ],
    "2029": [
     "o",
     237
    ],
    "2030": [
     "o",
     237
    ]
   }
  },
  {
   "id": "colossus-1",
   "name": "Colossus 1",
   "operator": "SpaceXAI",
   "users": "Anthropic",
   "project": "",
   "lat": 35.0802,
   "lng": -90.079,
   "loc_precision": "address",
   "place": "3231 Riverport Rd, Memphis, TN 38109",
   "state": "Tennessee",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2024,
   "power_mw_now": 425,
   "power_mw_full": 442,
   "full_build_date": "2025-07",
   "capex_bn_full": 12.9,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "July 2025 Permit for Gas Turbines",
     "u": "https://www.scribd.com/document/883601734/01156-01PC-070225-Permit"
    },
    {
     "t": "Southern Environmental Law Center Gas Permit Appeal, with additional satellite images",
     "u": "https://cdn.arstechnica.net/wp-content/uploads/2025/07/NAACP-and-YGGs-xAI-Air-Permit-Appeal-7-15-2025.pdf"
    },
    {
     "t": "Disclosure on X (formerly Twitter) by Elon Musk of the breakdown of GPUs",
     "u": "https://archive.is/oHQSA"
    },
    {
     "t": "Anthropic announcement",
     "u": "https://www.anthropic.com/news/higher-limits-spacex"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "o",
     181
    ],
    "2025": [
     "o",
     442
    ],
    "2026": [
     "o",
     425
    ],
    "2027": [
     "o",
     425
    ],
    "2028": [
     "o",
     425
    ],
    "2029": [
     "o",
     425
    ],
    "2030": [
     "o",
     425
    ]
   }
  },
  {
   "id": "google-council-bluffs-east",
   "name": "Google Council Bluffs (East)",
   "operator": "Google",
   "users": "Google DeepMind",
   "project": "",
   "lat": 41.1666,
   "lng": -95.7977,
   "loc_precision": "address",
   "place": "10410 Bunge Ave, Council Bluffs, IA 51503",
   "state": "Iowa",
   "country": "United States",
   "status": "operating",
   "start_year": 2022,
   "open_year": 2024,
   "power_mw_now": 284,
   "power_mw_full": 284,
   "full_build_date": "2026-07",
   "capex_bn_full": 9.0,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Construction permit application form with site address",
     "u": "https://programs.iowadnr.gov/easyair/Public/EnSuite/Shared/Pages/Util/ServerRptViewer.aspx?sr=/IDNR/Reports/EASY/RPT_Construction_Application_A_GEN&SUBMISSION_RID=67330&SUB_FORM_RID=148293"
    },
    {
     "t": "Construction permit application form with backup generator data",
     "u": "https://programs.iowadnr.gov/easyair/Public/EnSuite/Shared/Pages/Util/ServerRptViewer.aspx?sr=/IDNR/Reports/EASY/RPT_Construction_Application_E_EU&SUBMISSION_RID=67330&SUB_FORM_RID=148297"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "o",
     95
    ],
    "2025": [
     "o",
     190
    ],
    "2026": [
     "o",
     284
    ],
    "2027": [
     "o",
     284
    ],
    "2028": [
     "o",
     284
    ],
    "2029": [
     "o",
     284
    ],
    "2030": [
     "o",
     284
    ]
   }
  },
  {
   "id": "coreweave-denton-tx",
   "name": "CoreWeave Denton TX",
   "operator": "CoreWeave",
   "users": "OpenAI",
   "project": "",
   "lat": 33.2193,
   "lng": -97.1747,
   "loc_precision": "address",
   "place": "8171 Jim Christal Rd, Denton, TX 76207",
   "state": "Texas",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2025,
   "power_mw_now": 367,
   "power_mw_full": 395,
   "full_build_date": "2027-05",
   "capex_bn_full": 10.7,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Core Scientific - CoreWeave Announce 1.2B expansion in Denton, TX",
     "u": "https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site"
    },
    {
     "t": "Core Scientific - Denton Datacenter Official Site",
     "u": "https://corescientific.com/high-density-data-centers/denton-texas/"
    },
    {
     "t": "TMF - Core Scientific Q4 2025 Earnings Transcript",
     "u": "https://www.fool.com/earnings/call-transcripts/2026/03/02/core-scientific-corz-q4-2025-earnings-transcript/"
    },
    {
     "t": "WSJ - plans to rent to OpenAI",
     "u": "https://www.wsj.com/tech/ai/coreweave-stock-market-ai-bubble-a3c8c321"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     94
    ],
    "2026": [
     "o",
     367
    ],
    "2027": [
     "o",
     395
    ],
    "2028": [
     "o",
     395
    ],
    "2029": [
     "o",
     395
    ],
    "2030": [
     "o",
     395
    ]
   }
  },
  {
   "id": "qts-richmond-1",
   "name": "QTS Richmond 1",
   "operator": "",
   "users": "",
   "project": "",
   "lat": 37.4888,
   "lng": -77.2475,
   "loc_precision": "address",
   "place": "6000 Technology Blvd, Sandston, VA 23150",
   "state": "Virginia",
   "country": "United States",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2024,
   "power_mw_now": 333,
   "power_mw_full": 333,
   "full_build_date": "2025-11",
   "capex_bn_full": 9.0,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Richmond 1 factsheet",
     "u": "https://qtsdatacenters.com/data-centers/richmond-1/"
    },
    {
     "t": "Environmental permit detailing power generation",
     "u": "https://www.deq.virginia.gov/home/showpublisheddocument/25650/638627871515730000"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "o",
     132
    ],
    "2025": [
     "o",
     333
    ],
    "2026": [
     "o",
     333
    ],
    "2027": [
     "o",
     333
    ],
    "2028": [
     "o",
     333
    ],
    "2029": [
     "o",
     333
    ],
    "2030": [
     "o",
     333
    ]
   }
  },
  {
   "id": "bridge-data-centres-my06",
   "name": "Bridge Data Centres MY06",
   "operator": "ByteDance",
   "users": "ByteDance",
   "project": "",
   "lat": 1.7127,
   "lng": 103.5257,
   "loc_precision": "city/county",
   "place": "Bridge Data Centres, Sedenak Tech Park, Johor, Malaysia",
   "state": "",
   "country": "Malaysia",
   "status": "operating",
   "start_year": 2021,
   "open_year": 2022,
   "power_mw_now": 315,
   "power_mw_full": 315,
   "full_build_date": "2025-05",
   "capex_bn_full": 9.2,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Bridge Data Centers 2025 article about MY06",
     "u": "https://www.bridgedatacentres.com/bridge-data-centres-and-bca-international-to-partner-to-promote-green-data-centers-globally/"
    },
    {
     "t": "Drone footage from 2024",
     "u": "https://www.youtube.com/watch?v=n2b0ljMXyEg"
    },
    {
     "t": "Development authority linking Bytedance",
     "u": "https://www.mida.gov.my/media-release/bridge-data-centres-and-bytedance-celebrate-grand-opening-of-the-first-phase-hyperscale-data-centre-my06-in-johor-malaysia/"
    },
    {
     "t": "Street view linking second campus MY06-2",
     "u": "https://www.google.com/maps/@1.695402,103.4214409,3a,47.7y,213.04h,92.05t/data=!3m7!1e1!3m5!1sG4O28vWhkgGAlyz3dZ-fdg!2e0!6shttps:%2F%2Fstreetviewpixels-pa.googleapis.com%2Fv1%2Fthumbnail%3Fcb_client%3Dmaps_sv.tactile%26w%3D900%26h%3D600%26pitch%3D-2.0537269881136098%26panoid%3DG4O28vWhkgGAlyz3dZ-fdg%26yaw%3D213.043859649809!7i16384!8i8192?entry=ttu&g_ep=EgoyMDI2MDgxMi4wIKXMDSoASAFQAw%3D%3D"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2021": [
     "c",
     0
    ],
    "2022": [
     "o",
     25
    ],
    "2023": [
     "o",
     79
    ],
    "2024": [
     "o",
     148
    ],
    "2025": [
     "o",
     315
    ],
    "2026": [
     "o",
     315
    ],
    "2027": [
     "o",
     315
    ],
    "2028": [
     "o",
     315
    ],
    "2029": [
     "o",
     315
    ],
    "2030": [
     "o",
     315
    ]
   }
  },
  {
   "id": "meta-rosemount",
   "name": "Meta Rosemount",
   "operator": "Meta",
   "users": "Meta",
   "project": "",
   "lat": 44.7392,
   "lng": -93.1261,
   "loc_precision": "city",
   "place": "1772-2396 145th St, Rosemount, MN 55068, USA",
   "state": "Minnesota",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2026,
   "power_mw_now": 241,
   "power_mw_full": 241,
   "full_build_date": "2026-06",
   "capex_bn_full": 6.7,
   "water_mgd": 0.0,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Official Meta announcement.",
     "u": "https://datacenters.atmeta.com/2024/03/hello-rosemount/"
    },
    {
     "t": "Air quality permit for initial buildout.",
     "u": "https://drive.google.com/file/d/1i2D0eMp9uc1CfRhymu69Bms5wz9q0Rkc/view?usp=sharing"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     241
    ],
    "2027": [
     "o",
     241
    ],
    "2028": [
     "o",
     241
    ],
    "2029": [
     "o",
     241
    ],
    "2030": [
     "o",
     241
    ]
   }
  },
  {
   "id": "amazon-madison-mega-site",
   "name": "Amazon Madison Mega Site",
   "operator": "Amazon",
   "users": "Anthropic",
   "project": "Project Rainier",
   "lat": 32.6126,
   "lng": -90.0368,
   "loc_precision": "city/county",
   "place": "Amazon Data Services Inc, Madison Mega Site Nissan Parkway and Highway 22 Canton, Mississippi Madison County",
   "state": "Mississippi",
   "country": "United States",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2025,
   "power_mw_now": 341,
   "power_mw_full": 819,
   "full_build_date": "2028-03",
   "capex_bn_full": 25.9,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Backup diesel generator referenced in the permit",
     "u": "https://www.cat.com/en_US/products/new/power-systems/electric-power/diesel-generator-sets/117341.html"
    },
    {
     "t": "New York Times article on Project Rainier",
     "u": "https://www.nytimes.com/2025/06/24/technology/amazon-ai-data-centers.html"
    },
    {
     "t": "SemiAnalysis article with imagery of Canton they have labeled as being an Amazon-Anthropic collaboration",
     "u": "https://newsletter.semianalysis.com/p/amazons-ai-resurgence-aws-anthropics-multi-gigawatt-trainium-expansion"
    },
    {
     "t": "Air Construction Permit",
     "u": "https://drive.google.com/file/d/1lhSF8TBA7fNWsN4Onj-nfL7X_-BN573r/view?usp=sharing"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     341
    ],
    "2026": [
     "o",
     341
    ],
    "2027": [
     "o",
     478
    ],
    "2028": [
     "o",
     819
    ],
    "2029": [
     "o",
     819
    ],
    "2030": [
     "o",
     819
    ]
   }
  },
  {
   "id": "google-bristow",
   "name": "Google Bristow",
   "operator": "Google",
   "users": "Google DeepMind",
   "project": "",
   "lat": 38.7312,
   "lng": -77.548,
   "loc_precision": "city",
   "place": "13001 Rollins Ford Road, Bristow, VA 20136",
   "state": "Virginia",
   "country": "United States",
   "status": "operating",
   "start_year": 2021,
   "open_year": 2024,
   "power_mw_now": 286,
   "power_mw_full": 286,
   "full_build_date": "2026-05",
   "capex_bn_full": 9.0,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Google Environmental Report",
     "u": "https://sustainability.google/reports/google-2026-environmental-report/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2021": [
     "c",
     0
    ],
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "o",
     104
    ],
    "2025": [
     "o",
     208
    ],
    "2026": [
     "o",
     286
    ],
    "2027": [
     "o",
     286
    ],
    "2028": [
     "o",
     286
    ],
    "2029": [
     "o",
     286
    ],
    "2030": [
     "o",
     286
    ]
   }
  },
  {
   "id": "microsoft-goodyear",
   "name": "Microsoft Goodyear",
   "operator": "Microsoft",
   "users": "OpenAI, Microsoft",
   "project": "",
   "lat": 33.409,
   "lng": -112.3648,
   "loc_precision": "address",
   "place": "14250 W Broadway Rd, Goodyear, AZ 85338",
   "state": "Arizona",
   "country": "United States",
   "status": "operating",
   "start_year": 2021,
   "open_year": 2023,
   "power_mw_now": 263,
   "power_mw_full": 263,
   "full_build_date": "2025-09",
   "capex_bn_full": 7.7,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Maricopa County map",
     "u": "https://gis.maricopa.gov/aqd/recordsviewer/#"
    },
    {
     "t": "Dust control permit",
     "u": "https://edms.maricopa.gov/aq/api/Document/AQizTh7Ek3Odb1UYnAFQc%C3%81Z0k59aCsu4%C3%890gw6xcPqnhTfYtG7scD%C3%89BewWyX4qdzXFk%C3%81xL9%C3%89VthN71ODAxZuKKeU%3D/"
    },
    {
     "t": "SemiAnalysis article",
     "u": "https://newsletter.semianalysis.com/p/microsofts-ai-strategy-deconstructed"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2021": [
     "c",
     0
    ],
    "2022": [
     "c",
     0
    ],
    "2023": [
     "o",
     53
    ],
    "2024": [
     "o",
     53
    ],
    "2025": [
     "o",
     263
    ],
    "2026": [
     "o",
     263
    ],
    "2027": [
     "o",
     263
    ],
    "2028": [
     "o",
     263
    ],
    "2029": [
     "o",
     263
    ],
    "2030": [
     "o",
     263
    ]
   }
  },
  {
   "id": "meta-jeffersonville",
   "name": "Meta Jeffersonville",
   "operator": "Meta",
   "users": "Meta",
   "project": "",
   "lat": 38.2791,
   "lng": -85.739,
   "loc_precision": "address",
   "place": "500 8th St, Jeffersonville, IN 47130, USA",
   "state": "Indiana",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2026,
   "power_mw_now": 241,
   "power_mw_full": 241,
   "full_build_date": "2026-06",
   "capex_bn_full": 6.7,
   "water_mgd": 0.0,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Official Meta Fact Sheet ",
     "u": "https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Jeffersonville-Data-Center.pdf"
    },
    {
     "t": "Turner Construction contractor presenting their involvement in the project.",
     "u": "https://www.turnerconstruction.com/insights/turner-construction-company-to-build-hyperscale-data-center-for-meta-in-indiana"
    },
    {
     "t": "Air Quality Permit for initial buildout",
     "u": "https://drive.google.com/file/d/1RpOCS_z32qaWskhhAJL8_QjU9VSz5Eqh/view?usp=sharing"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     241
    ],
    "2027": [
     "o",
     241
    ],
    "2028": [
     "o",
     241
    ],
    "2029": [
     "o",
     241
    ],
    "2030": [
     "o",
     241
    ]
   }
  },
  {
   "id": "google-kansas-city-east",
   "name": "Google Kansas City East",
   "operator": "Google",
   "users": "",
   "project": "",
   "lat": 39.1001,
   "lng": -94.5781,
   "loc_precision": "city/county",
   "place": "Kansas City, Missouri",
   "state": "Missouri",
   "country": "United States",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2026,
   "power_mw_now": 126,
   "power_mw_full": 126,
   "full_build_date": "2026-08",
   "capex_bn_full": 4.0,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Hunt Midwest Business Center press release linking data center with Google",
     "u": "https://huntmidwest.com/2024/03/google-announces-1-billion-data-center-at-hunt-midwest-business-center/"
    },
    {
     "t": "DCD article on the site",
     "u": "https://www.datacenterdynamics.com/en/news/google-files-project-plan-for-data-center-in-kansas-city-missouri/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     126
    ],
    "2027": [
     "o",
     126
    ],
    "2028": [
     "o",
     126
    ],
    "2029": [
     "o",
     126
    ],
    "2030": [
     "o",
     126
    ]
   }
  },
  {
   "id": "meta-temple",
   "name": "Meta Temple",
   "operator": "Meta",
   "users": "Meta",
   "project": "",
   "lat": 31.126,
   "lng": -97.3598,
   "loc_precision": "address",
   "place": "2310 Eberhardt Rd, Temple, TX 76504",
   "state": "Texas",
   "country": "United States",
   "status": "operating",
   "start_year": 2022,
   "open_year": 2025,
   "power_mw_now": 231,
   "power_mw_full": 231,
   "full_build_date": "2026-09",
   "capex_bn_full": 6.7,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "JE Dunn project page",
     "u": "https://jedunn.com/projects/meta-temple-data-center/"
    },
    {
     "t": "TDLR filing",
     "u": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022017728"
    },
    {
     "t": "TDLR filing",
     "u": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008019"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     198
    ],
    "2026": [
     "o",
     231
    ],
    "2027": [
     "o",
     231
    ],
    "2028": [
     "o",
     231
    ],
    "2029": [
     "o",
     231
    ],
    "2030": [
     "o",
     231
    ]
   }
  },
  {
   "id": "aws-new-albany",
   "name": "AWS New Albany",
   "operator": "Amazon",
   "users": "",
   "project": "",
   "lat": 40.0812,
   "lng": -82.8088,
   "loc_precision": "city/county",
   "place": "13360 Miller Rd NW",
   "state": "Ohio",
   "country": "United States",
   "status": "operating",
   "start_year": 2022,
   "open_year": 2024,
   "power_mw_now": 255,
   "power_mw_full": 405,
   "full_build_date": "2027-07",
   "capex_bn_full": 12.8,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "City of New Albany Project Updates",
     "u": "https://newalbanyohio.org/community-development/project-updates/"
    },
    {
     "t": "New Albany Community Development Report - Dec. 2024",
     "u": "https://newalbanyohio.org/wp-content/uploads/2025/01/CD-2024-12.pdf"
    },
    {
     "t": "New Albany Community Development Report - Aug. 2025",
     "u": "https://newalbanyohio.org/wp-content/uploads/2025/09/CD-2025-08.pdf"
    },
    {
     "t": "Article reporting first signing of the project",
     "u": "https://www.wosu.org/politics-government/2023-09-20/new-albany-city-council-approves-tax-break-deal-for-3-5-billion-amazon-data-center-project"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "o",
     136
    ],
    "2025": [
     "o",
     136
    ],
    "2026": [
     "o",
     255
    ],
    "2027": [
     "o",
     405
    ],
    "2028": [
     "o",
     405
    ],
    "2029": [
     "o",
     405
    ],
    "2030": [
     "o",
     405
    ]
   }
  },
  {
   "id": "google-omaha",
   "name": "Google Omaha",
   "operator": "Google",
   "users": "Google DeepMind",
   "project": "",
   "lat": 41.3357,
   "lng": -96.0524,
   "loc_precision": "address",
   "place": "11110 State St, Omaha, NE 68142",
   "state": "Nebraska",
   "country": "United States",
   "status": "operating",
   "start_year": 2021,
   "open_year": 2024,
   "power_mw_now": 284,
   "power_mw_full": 474,
   "full_build_date": "2028-07",
   "capex_bn_full": 15.0,
   "water_mgd": 0.088,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "2025 Environmental Report",
     "u": "https://sustainability.google/reports/google-2025-environmental-report/"
    },
    {
     "t": "Draft basis of air permit with details of cooling towers",
     "u": "https://drive.google.com/file/d/1KN7o-wQOyt1UEud8wpM8PymXJF479r0n/view?usp=sharing"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2021": [
     "c",
     0
    ],
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "o",
     189
    ],
    "2025": [
     "o",
     189
    ],
    "2026": [
     "o",
     284
    ],
    "2027": [
     "o",
     284
    ],
    "2028": [
     "o",
     474
    ],
    "2029": [
     "o",
     474
    ],
    "2030": [
     "o",
     474
    ]
   }
  },
  {
   "id": "google-lincoln",
   "name": "Google Lincoln",
   "operator": "Google",
   "users": "",
   "project": "",
   "lat": 40.9075,
   "lng": -96.6458,
   "loc_precision": "address",
   "place": "5475 Cloud Ct, Lincoln, NE 68514",
   "state": "Nebraska",
   "country": "United States",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2026,
   "power_mw_now": 170,
   "power_mw_full": 339,
   "full_build_date": "2027-10",
   "capex_bn_full": 10.7,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Army corps land use application with a useful construction plan diagram, split across 7 phases",
     "u": "https://upload.wikimedia.org/wikipedia/commons/2/25/Application_no-_NWO-2019-00110-WEH_-_USACE-p16021coll15-1525.pdf"
    },
    {
     "t": "DCD article on the start of site construction",
     "u": "https://www.datacenterdynamics.com/en/news/work-on-data-center-in-lincoln-nebraska-finally-starting/"
    },
    {
     "t": "Rezoning approval, stating 75 ft building height",
     "u": "https://lnklan.granicus.com/DocumentViewer.php?file=lnklan_bfe1e3023d49404348f26355e113cb22.pdf&view=1"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     170
    ],
    "2027": [
     "o",
     339
    ],
    "2028": [
     "o",
     339
    ],
    "2029": [
     "o",
     339
    ],
    "2030": [
     "o",
     339
    ]
   }
  },
  {
   "id": "qts-richmond-2",
   "name": "QTS Richmond 2",
   "operator": "",
   "users": "",
   "project": "",
   "lat": 37.5235,
   "lng": -77.3158,
   "loc_precision": "city",
   "place": "6030–6070 Technology Blvd, Sandston, VA 23150",
   "state": "Virginia",
   "country": "United States",
   "status": "operating",
   "start_year": 2022,
   "open_year": 2025,
   "power_mw_now": 252,
   "power_mw_full": 252,
   "full_build_date": "2026-05",
   "capex_bn_full": 6.8,
   "water_mgd": 0.0,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Richmond 2 factsheet",
     "u": "https://qtsdatacenters.com/data-centers/richmond-1/"
    },
    {
     "t": "Environmental permit detailing power generation",
     "u": "https://www.deq.virginia.gov/home/showpublisheddocument/25650/638627871515730000"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     202
    ],
    "2026": [
     "o",
     252
    ],
    "2027": [
     "o",
     252
    ],
    "2028": [
     "o",
     252
    ],
    "2029": [
     "o",
     252
    ],
    "2030": [
     "o",
     252
    ]
   }
  },
  {
   "id": "google-the-dalles",
   "name": "Google The Dalles",
   "operator": "Google",
   "users": "",
   "project": "",
   "lat": 45.6254,
   "lng": -121.2024,
   "loc_precision": "address",
   "place": "3500 River Rd, The Dalles, OR",
   "state": "Oregon",
   "country": "United States",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2025,
   "power_mw_now": 185,
   "power_mw_full": 185,
   "full_build_date": "2026-04",
   "capex_bn_full": 5.8,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Permit confirming this is a data center and the internal square footage",
     "u": "https://static1.squarespace.com/static/5e9a1686f716835e61268f2a/t/63659cb153e00407c9cd0bc9/1667603634454/SPR%2B512-22%2C%2BNOD%2C%2B10-31-22%2B%281%29.pdf"
    },
    {
     "t": "Google PUE data listing the \"3rd facility\" from Q3 2025",
     "u": "https://datacenters.google/efficiency/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     93
    ],
    "2026": [
     "o",
     185
    ],
    "2027": [
     "o",
     185
    ],
    "2028": [
     "o",
     185
    ],
    "2029": [
     "o",
     185
    ],
    "2030": [
     "o",
     185
    ]
   }
  },
  {
   "id": "qts-richmond-3",
   "name": "QTS Richmond 3",
   "operator": "",
   "users": "",
   "project": "",
   "lat": 37.5235,
   "lng": -77.3158,
   "loc_precision": "city",
   "place": "3525–3543 Portugee Rd, Sandston, VA 23150",
   "state": "Virginia",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2026,
   "power_mw_now": 202,
   "power_mw_full": 336,
   "full_build_date": "2027-02",
   "capex_bn_full": 9.1,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Richmond 3 factsheet",
     "u": "https://q.com/data-centers/richmond-3/"
    },
    {
     "t": "Environmental permit detailing power generation",
     "u": "https://www.deq.virginia.gov/home/showpublisheddocument/25650/638627871515730000"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     202
    ],
    "2027": [
     "o",
     336
    ],
    "2028": [
     "o",
     336
    ],
    "2029": [
     "o",
     336
    ],
    "2030": [
     "o",
     336
    ]
   }
  },
  {
   "id": "meta-montgomery",
   "name": "Meta Montgomery",
   "operator": "Meta",
   "users": "Meta",
   "project": "",
   "lat": 32.3777,
   "lng": -86.3091,
   "loc_precision": "city/county",
   "place": "Co Rd 42, Montgomery, AL 36105, USA",
   "state": "Alabama",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2026,
   "power_mw_now": 199,
   "power_mw_full": 465,
   "full_build_date": "2027-02",
   "capex_bn_full": 13.6,
   "water_mgd": 0.0,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Meta Introduction to the Montgomery Project",
     "u": "https://datacenters.atmeta.com/2024/05/hello-montgomery/"
    },
    {
     "t": "Meta expansion announcement",
     "u": "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/"
    },
    {
     "t": "Contractor announcement",
     "u": "https://www.henselphelps.com/meta-awards-hensel-phelps-montgomery-data-center/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     199
    ],
    "2027": [
     "o",
     465
    ],
    "2028": [
     "o",
     465
    ],
    "2029": [
     "o",
     465
    ],
    "2030": [
     "o",
     465
    ]
   }
  },
  {
   "id": "meta-kuna",
   "name": "Meta Kuna",
   "operator": "Meta",
   "users": "Meta",
   "project": "",
   "lat": 43.4592,
   "lng": -116.4211,
   "loc_precision": "address",
   "place": "601 Kuna Mora Rd,  Kuna ID 83634",
   "state": "Idaho",
   "country": "United States",
   "status": "operating",
   "start_year": 2022,
   "open_year": 2026,
   "power_mw_now": 198,
   "power_mw_full": 198,
   "full_build_date": "2026-06",
   "capex_bn_full": 5.8,
   "water_mgd": 0.07,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Official Pamphlet from Meta",
     "u": "https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Kuna-Data-Center.pdf"
    },
    {
     "t": "Application for Power Purchase Agreement, Pleasant Valley Solar 1 ",
     "u": "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2229/CaseFiles/20221114Application.pdf"
    },
    {
     "t": "Application for Power Purchase Agreement, Pleasant Valley Solar 2",
     "u": "https://lf-puc.idaho.gov/WebLink/DocView.aspx?dbid=0&id=73294"
    },
    {
     "t": "Approval to move start date of Solar 2 to May 31, 2026",
     "u": "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2420/OrdNotc/20240913Final_Order_No_36322.pdf"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     198
    ],
    "2027": [
     "o",
     198
    ],
    "2028": [
     "o",
     198
    ],
    "2029": [
     "o",
     198
    ],
    "2030": [
     "o",
     198
    ]
   }
  },
  {
   "id": "meta-cheyenne",
   "name": "Meta Cheyenne",
   "operator": "Meta",
   "users": "Meta",
   "project": "",
   "lat": 41.14,
   "lng": -104.8202,
   "loc_precision": "city/county",
   "place": "Cheyenne, WY 82007, USA",
   "state": "Wyoming",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2026,
   "power_mw_now": 182,
   "power_mw_full": 249,
   "full_build_date": "2027-02",
   "capex_bn_full": 7.8,
   "water_mgd": 0.0,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Meta Introduction to the Cheyenne Project",
     "u": "https://datacenters.atmeta.com/2024/07/hello-cheyenne/"
    },
    {
     "t": "Fortis Construction announcement",
     "u": "https://fortisconstruction.com/news/fortis-building-metas-cheyenne-campus/"
    },
    {
     "t": "Press announcement suggesting a 2027 operational date",
     "u": "https://cheyenneleads.org/meta-announces-new-data-center-a-major-investment-in-cheyenne-wyoming/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     182
    ],
    "2027": [
     "o",
     249
    ],
    "2028": [
     "o",
     249
    ],
    "2029": [
     "o",
     249
    ],
    "2030": [
     "o",
     249
    ]
   }
  },
  {
   "id": "amazon-ridgeland",
   "name": "Amazon Ridgeland",
   "operator": "Amazon",
   "users": "Anthropic",
   "project": "Project Rainier",
   "lat": 32.4,
   "lng": -90.1972,
   "loc_precision": "address",
   "place": "1626 County Line Road Ridgeland, Mississippi",
   "state": "Mississippi",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2026,
   "power_mw_now": 273,
   "power_mw_full": 1008,
   "full_build_date": "2028-09",
   "capex_bn_full": 31.8,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Backup diesel generator referenced in the permit",
     "u": "https://www.cat.com/en_US/products/new/power-systems/electric-power/diesel-generator-sets/117341.html"
    },
    {
     "t": "New York Times article on Project Rainier",
     "u": "https://www.nytimes.com/2025/06/24/technology/amazon-ai-data-centers.html"
    },
    {
     "t": "Air Construction Permit",
     "u": "https://drive.google.com/file/d/1dQ5Pxl7rQAHLvHoTYrpOX32WAolo46d7/view?usp=sharing"
    },
    {
     "t": "Permit review document",
     "u": "https://drive.google.com/file/d/1myQ6BYqqzcfsWwv41tufHobvA8T3qo_d/view?usp=sharing"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     273
    ],
    "2027": [
     "o",
     341
    ],
    "2028": [
     "o",
     1008
    ],
    "2029": [
     "o",
     1008
    ],
    "2030": [
     "o",
     1008
    ]
   }
  },
  {
   "id": "meta-huntsville",
   "name": "Meta Huntsville",
   "operator": "Meta",
   "users": "Meta",
   "project": "",
   "lat": 34.8981,
   "lng": -86.7336,
   "loc_precision": "city/county",
   "place": "5400 Prosperity Dr NW, Toney, AL",
   "state": "Alabama",
   "country": "United States",
   "status": "operating",
   "start_year": 2021,
   "open_year": 2026,
   "power_mw_now": 198,
   "power_mw_full": 198,
   "full_build_date": "2026-06",
   "capex_bn_full": 5.5,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Announcement of expansion completing in 2026 ",
     "u": "https://plateauexcavation.com/projects/huntsville-meta-data-center-meta-project-ferris/"
    },
    {
     "t": "TVA solar installation announcements",
     "u": "https://www.prnewswire.com/news-releases/tva-announces-largest-valley-solar-installations--built-for-facebook-300743255.html"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2021": [
     "c",
     0
    ],
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     198
    ],
    "2027": [
     "o",
     198
    ],
    "2028": [
     "o",
     198
    ],
    "2029": [
     "o",
     198
    ],
    "2030": [
     "o",
     198
    ]
   }
  },
  {
   "id": "coreweave-helios",
   "name": "Coreweave Helios",
   "operator": "CoreWeave",
   "users": "OpenAI",
   "project": "",
   "lat": 33.7629,
   "lng": -100.8168,
   "loc_precision": "city/county",
   "place": "984 County Road 112, Afton, TX 79220",
   "state": "Texas",
   "country": "United States",
   "status": "operating",
   "start_year": 2025,
   "open_year": 2026,
   "power_mw_now": 200,
   "power_mw_full": 800,
   "full_build_date": "2029-01",
   "capex_bn_full": 20.0,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Galaxy Q3 financial results with power capacity timeline",
     "u": "https://investor.galaxy.com/news/news-details/2025/Galaxy-Announces-Third-Quarter-2025-Financial-Results/default.aspx"
    },
    {
     "t": "Permit review with details on backup generators and power capacity",
     "u": "https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8711478&Rendition=Web#:~:text=Galaxy%20Helios%20I%20LLC%20owns,are%20the%20basis%20of%20the"
    },
    {
     "t": "3D renderings of Helios Building 1 on Galaxy's website, showing generators and chillers",
     "u": "https://www.galaxy.com/data-centers"
    },
    {
     "t": "TDLR record with Building 1 construction costs and end date",
     "u": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025012175"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     200
    ],
    "2027": [
     "o",
     200
    ],
    "2028": [
     "o",
     600
    ],
    "2029": [
     "o",
     800
    ],
    "2030": [
     "o",
     800
    ]
   }
  },
  {
   "id": "microsoft-project-osmium",
   "name": "Microsoft Project Osmium",
   "operator": "Microsoft",
   "users": "OpenAI",
   "project": "",
   "lat": 41.4833,
   "lng": -93.7624,
   "loc_precision": "city",
   "place": "5855 SW Kerry St, Cumming, IA 50061",
   "state": "Iowa",
   "country": "United States",
   "status": "operating",
   "start_year": 2018,
   "open_year": 2021,
   "power_mw_now": 228,
   "power_mw_full": 228,
   "full_build_date": "2025-03",
   "capex_bn_full": 7.2,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "SemiAnalysis article with IT power estimations and detailing usage by OpenAI for training GPT 3.5",
     "u": "https://newsletter.semianalysis.com/p/microsofts-ai-strategy-deconstructed"
    },
    {
     "t": "DCD Article on site expansion",
     "u": "https://www.datacenterdynamics.com/en/news/microsoft-granted-permit-for-new-data-center-in-des-moines-iowa/"
    },
    {
     "t": "MISO Announcement reporting power for newest buildings, likely an overestimate",
     "u": "https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf"
    },
    {
     "t": "Microsoft article on data centers in Iowa used by OpenAI",
     "u": "https://news.microsoft.com/source/features/ai/west-des-moines-iowa-ai-supercomputer/?msockid=23bbdd21a02166402e27c929a1a567ce"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2018": [
     "c",
     0
    ],
    "2019": [
     "c",
     0
    ],
    "2020": [
     "c",
     0
    ],
    "2021": [
     "o",
     57
    ],
    "2022": [
     "o",
     57
    ],
    "2023": [
     "o",
     114
    ],
    "2024": [
     "o",
     114
    ],
    "2025": [
     "o",
     228
    ],
    "2026": [
     "o",
     228
    ],
    "2027": [
     "o",
     228
    ],
    "2028": [
     "o",
     228
    ],
    "2029": [
     "o",
     228
    ],
    "2030": [
     "o",
     228
    ]
   }
  },
  {
   "id": "ytl-johor",
   "name": "YTL Johor",
   "operator": "",
   "users": "",
   "project": "",
   "lat": 1.6667,
   "lng": 103.6,
   "loc_precision": "city/county",
   "place": "YTL Green Data Centers, Kulai, Johor, Malaysia",
   "state": "",
   "country": "Malaysia",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2025,
   "power_mw_now": 155,
   "power_mw_full": 389,
   "full_build_date": "2028-08",
   "capex_bn_full": 10.8,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Official YTL page for the campus",
     "u": "https://ytldatacenters.com/locations/malaysia/"
    },
    {
     "t": "YTL press release on the use of GB200's",
     "u": "https://www.ytlpowerinternational.com/press-releases/ytl-creates-one-of-the-worlds-most-advanced-supercomputers-powered-by-nvidia-grace-blackwell-based-dgx-cloud/"
    },
    {
     "t": "Aerial footage including the campus",
     "u": "https://www.youtube.com/watch?v=HODHjDbFt10"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     26
    ],
    "2026": [
     "o",
     155
    ],
    "2027": [
     "o",
     155
    ],
    "2028": [
     "o",
     389
    ],
    "2029": [
     "o",
     389
    ],
    "2030": [
     "o",
     389
    ]
   }
  },
  {
   "id": "meta-eagle-mountain",
   "name": "Meta Eagle Mountain",
   "operator": "Meta",
   "users": "Meta",
   "project": "",
   "lat": 40.3093,
   "lng": -112.012,
   "loc_precision": "city",
   "place": "1275 N Community Cir, Eagle Mountain, UT 84005",
   "state": "Utah",
   "country": "United States",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2025,
   "power_mw_now": 179,
   "power_mw_full": 179,
   "full_build_date": "2025-12",
   "capex_bn_full": 5.0,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Expansion announcement by Meta ",
     "u": "https://www.facebook.com/EagleMountainDataCenter/posts/517902967007646"
    },
    {
     "t": "Report on Williams Company gas-fired plant under construction adjacent to data cente",
     "u": "https://ukozvhzgrcnkcatjqfoo.supabase.co/storage/v1/object/public/03-00-air-construction/2026.02.05_Eagle%20Mountain%20Power%20Plant_Application_32a5238b.pdf"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     179
    ],
    "2026": [
     "o",
     179
    ],
    "2027": [
     "o",
     179
    ],
    "2028": [
     "o",
     179
    ],
    "2029": [
     "o",
     179
    ],
    "2030": [
     "o",
     179
    ]
   }
  },
  {
   "id": "meta-aiken",
   "name": "Meta Aiken",
   "operator": "Meta",
   "users": "Meta",
   "project": "",
   "lat": 33.7417,
   "lng": -81.8423,
   "loc_precision": "city",
   "place": "7601 State Hwy 105, Trenton, SC 29847, USA",
   "state": "South Carolina",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2026,
   "power_mw_now": 168,
   "power_mw_full": 168,
   "full_build_date": "2026-11",
   "capex_bn_full": 4.9,
   "water_mgd": 0.0,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Meta Introduction to the Aiken Project",
     "u": "https://datacenters.atmeta.com/2024/08/hello-south-carolina/"
    },
    {
     "t": "DPR Construction project page",
     "u": "https://www.dpr.com/projects/meta-aiken-data-center-aiken-sc"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     168
    ],
    "2027": [
     "o",
     168
    ],
    "2028": [
     "o",
     168
    ],
    "2029": [
     "o",
     168
    ],
    "2030": [
     "o",
     168
    ]
   }
  },
  {
   "id": "google-midlothian",
   "name": "Google Midlothian",
   "operator": "Google",
   "users": "",
   "project": "",
   "lat": 32.4389,
   "lng": -97.0508,
   "loc_precision": "address",
   "place": "3250 Railport Parkway, Midlothian, TX 76065",
   "state": "Texas",
   "country": "United States",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2026,
   "power_mw_now": 123,
   "power_mw_full": 123,
   "full_build_date": "2026-07",
   "capex_bn_full": 3.9,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Site Map and Permit",
     "u": "https://ecode360.com/MI6405/laws/LF1665983.pdf"
    },
    {
     "t": "City Council Presentation",
     "u": "https://archive-stream.granicus.com/OnDemand/_definst_/mp4:swagitVideo/midlothiantx/eefcd9e0-4c12-41ba-986a-165a20124c72.mp4/playlist.m3u8"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     123
    ],
    "2027": [
     "o",
     123
    ],
    "2028": [
     "o",
     123
    ],
    "2029": [
     "o",
     123
    ],
    "2030": [
     "o",
     123
    ]
   }
  },
  {
   "id": "google-storey-county",
   "name": "Google Storey County",
   "operator": "Google",
   "users": "Google DeepMind",
   "project": "",
   "lat": 39.4572,
   "lng": -119.5158,
   "loc_precision": "city/county",
   "place": "Storey County, Nevada",
   "state": "Nevada",
   "country": "United States",
   "status": "operating",
   "start_year": 2019,
   "open_year": 2023,
   "power_mw_now": 214,
   "power_mw_full": 389,
   "full_build_date": "2027-06",
   "capex_bn_full": 11.4,
   "water_mgd": 0.001,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Air quality permit application listing emergency generators and a small \"R&D\" fuel cell plant",
     "u": "https://ndep-onbase.nv.gov/api/Document/AeFo%C3%89pjclbkomJ7CWpPryLOjA6FQT9HFrkSuMWbMXTpKCzSR%C3%81W1f8zzFhGhik1iZCcNSpuTRRqNXD1inrrpBxtA%3D/"
    },
    {
     "t": "Aterio",
     "u": "https://www.aterio.io/"
    },
    {
     "t": "Google data center page",
     "u": "https://datacenters.google/locations/storey-county-nevada/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2019": [
     "c",
     0
    ],
    "2020": [
     "c",
     0
    ],
    "2021": [
     "c",
     0
    ],
    "2022": [
     "c",
     0
    ],
    "2023": [
     "o",
     107
    ],
    "2024": [
     "o",
     107
    ],
    "2025": [
     "o",
     214
    ],
    "2026": [
     "o",
     214
    ],
    "2027": [
     "o",
     389
    ],
    "2028": [
     "o",
     389
    ],
    "2029": [
     "o",
     389
    ],
    "2030": [
     "o",
     389
    ]
   }
  },
  {
   "id": "meta-los-lunas",
   "name": "Meta Los Lunas",
   "operator": "Meta",
   "users": "Meta",
   "project": "",
   "lat": 34.8302,
   "lng": -106.7838,
   "loc_precision": "address",
   "place": "4250 Messenger Lp, Los Lunas, NM 87031",
   "state": "New Mexico",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2026,
   "power_mw_now": 147,
   "power_mw_full": 273,
   "full_build_date": "2028-01",
   "capex_bn_full": 8.3,
   "water_mgd": 0.0,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Meta fact sheet",
     "u": "https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf"
    },
    {
     "t": "Construction contractor page for the site",
     "u": "https://fortisconstruction.com/project/meta-los-lunas-campus/"
    },
    {
     "t": "Air quality permit for expansion",
     "u": "https://drive.google.com/file/d/1TxuazhSkiaHCd5FGKh_Syc_RsrzfV7Wd/view?usp=drive_link"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     147
    ],
    "2027": [
     "o",
     147
    ],
    "2028": [
     "o",
     273
    ],
    "2029": [
     "o",
     273
    ],
    "2030": [
     "o",
     273
    ]
   }
  },
  {
   "id": "google-lancaster",
   "name": "Google Lancaster",
   "operator": "Google",
   "users": "",
   "project": "",
   "lat": 39.727,
   "lng": -82.6831,
   "loc_precision": "address",
   "place": "105 Whiley Rd, Lancaster, OH 43130",
   "state": "Ohio",
   "country": "United States",
   "status": "operating",
   "start_year": 2021,
   "open_year": 2024,
   "power_mw_now": 164,
   "power_mw_full": 164,
   "full_build_date": "2025-10",
   "capex_bn_full": 5.2,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "DCD article discussing the announcement of this site",
     "u": "https://www.datacenterdynamics.com/en/news/google-to-build-two-more-data-centers-in-columbus-ohio/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2021": [
     "c",
     0
    ],
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "o",
     82
    ],
    "2025": [
     "o",
     164
    ],
    "2026": [
     "o",
     164
    ],
    "2027": [
     "o",
     164
    ],
    "2028": [
     "o",
     164
    ],
    "2029": [
     "o",
     164
    ],
    "2030": [
     "o",
     164
    ]
   }
  },
  {
   "id": "meta-qts-hillsboro-2",
   "name": "Meta-QTS Hillsboro 2",
   "operator": "Meta",
   "users": "Meta",
   "project": "",
   "lat": 45.5589,
   "lng": -122.9296,
   "loc_precision": "address",
   "place": "4755 NE Huffman St, Hillsboro, OR 97124",
   "state": "Oregon",
   "country": "United States",
   "status": "operating",
   "start_year": 2021,
   "open_year": 2023,
   "power_mw_now": 243,
   "power_mw_full": 243,
   "full_build_date": "2024-11",
   "capex_bn_full": 6.8,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "QTS Hillsboro 2 data center announcement",
     "u": "https://q.com/data-centers/hillsboro-2/"
    },
    {
     "t": "QTS and Meta sign an agreement with PGE for a 120MWac solar installation",
     "u": "https://q.com/news/avangrid-and-portland-general-electric-collaborate-with-qts-and-meta-to-build-120-mwac-solar-project-in-oregon/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2021": [
     "c",
     0
    ],
    "2022": [
     "c",
     0
    ],
    "2023": [
     "o",
     61
    ],
    "2024": [
     "o",
     243
    ],
    "2025": [
     "o",
     243
    ],
    "2026": [
     "o",
     243
    ],
    "2027": [
     "o",
     243
    ],
    "2028": [
     "o",
     243
    ],
    "2029": [
     "o",
     243
    ],
    "2030": [
     "o",
     243
    ]
   }
  },
  {
   "id": "google-waltham-cross",
   "name": "Google Waltham Cross",
   "operator": "Google",
   "users": "Google DeepMind",
   "project": "",
   "lat": 51.7021,
   "lng": -0.0336,
   "loc_precision": "city/county",
   "place": "Land at Maxwell's Farm West, Great Cambridge Road, Cheshunt, EN8 8XH",
   "state": "",
   "country": "United Kingdom",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2025,
   "power_mw_now": 124,
   "power_mw_full": 124,
   "full_build_date": "2025-09",
   "capex_bn_full": 3.3,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Google — Waltham Cross data centre page",
     "u": "https://datacenters.google/locations/waltham-cross/"
    },
    {
     "t": "Google opening announcement (Sept 2025)",
     "u": "https://www.googlecloudpresscorner.com/2025-09-16-Google-Opens-Waltham-Cross-Data-Centre-as-Part-of-Two-year-GBP5-Billion-Investment-in-the-UK-to-Help-Power-its-AI-Economy"
    },
    {
     "t": "Project Saracen scoping report (Broxbourne planning application ref 07/18/1181/O) ",
     "u": "https://www.broxbourne.gov.uk/downloads/file/51/project-saracen-scoping-report-for-submission-full-13-08-18-compressed-v2"
    },
    {
     "t": "Planning application description (CPRE Hertfordshire)",
     "u": "https://www.cpreherts.org.uk/resources/land-at-maxwells-farm-west-great-cambridge-road-cheshunt-hertfordshire/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     124
    ],
    "2026": [
     "o",
     124
    ],
    "2027": [
     "o",
     124
    ],
    "2028": [
     "o",
     124
    ],
    "2029": [
     "o",
     124
    ],
    "2030": [
     "o",
     124
    ]
   }
  },
  {
   "id": "vnet-bayin-ulanqab",
   "name": "VNET Bayin Ulanqab",
   "operator": "ByteDance",
   "users": "ByteDance",
   "project": "10 GW Hyperscale 2.0",
   "lat": 40.9903,
   "lng": 113.1316,
   "loc_precision": "city/county",
   "place": "Bayin, Ulanqab, China",
   "state": "",
   "country": "China",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2025,
   "power_mw_now": 252,
   "power_mw_full": 798,
   "full_build_date": "2027-09",
   "capex_bn_full": 26.5,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     252
    ],
    "2026": [
     "o",
     252
    ],
    "2027": [
     "o",
     798
    ],
    "2028": [
     "o",
     798
    ],
    "2029": [
     "o",
     798
    ],
    "2030": [
     "o",
     798
    ]
   }
  },
  {
   "id": "google-arcola",
   "name": "Google Arcola",
   "operator": "Google",
   "users": "",
   "project": "",
   "lat": 39.0017,
   "lng": -77.4033,
   "loc_precision": "city",
   "place": "42575 Arcola Blvd, Sterling, VA 20166",
   "state": "Virginia",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2026,
   "power_mw_now": 93,
   "power_mw_full": 93,
   "full_build_date": "2026-06",
   "capex_bn_full": 2.9,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Google Investing $1B To Improve Northern Virginia Data Centers (via Aterio)",
     "u": "https://www.bisnow.com/national/news/data-center/google-investing-1b-to-improve-northern-virginia-data-centers-124025"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     93
    ],
    "2027": [
     "o",
     93
    ],
    "2028": [
     "o",
     93
    ],
    "2029": [
     "o",
     93
    ],
    "2030": [
     "o",
     93
    ]
   }
  },
  {
   "id": "google-red-oak",
   "name": "Google Red Oak",
   "operator": "Google",
   "users": "",
   "project": "",
   "lat": 32.5376,
   "lng": -96.7967,
   "loc_precision": "address",
   "place": "330 Austin Blvd, Red Oak, TX 75154",
   "state": "Texas",
   "country": "United States",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2025,
   "power_mw_now": 93,
   "power_mw_full": 185,
   "full_build_date": "2026-12",
   "capex_bn_full": 5.8,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Media coverage confirming location, project name, investment size, and some timing",
     "u": "https://www.mysanantonio.com/business/article/google-texas-data-center-21236627.php"
    },
    {
     "t": "Google PUE data listing the Red Oak site from Q1 2026",
     "u": "https://datacenters.google/efficiency/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     93
    ],
    "2026": [
     "o",
     185
    ],
    "2027": [
     "o",
     185
    ],
    "2028": [
     "o",
     185
    ],
    "2029": [
     "o",
     185
    ],
    "2030": [
     "o",
     185
    ]
   }
  },
  {
   "id": "google-papillion",
   "name": "Google Papillion",
   "operator": "Google",
   "users": "Google DeepMind",
   "project": "",
   "lat": 41.1544,
   "lng": -96.0422,
   "loc_precision": "city/county",
   "place": "14651-15249 Gold Coast Rd 68138 Papillion Nebraska, USA",
   "state": "Nebraska",
   "country": "United States",
   "status": "operating",
   "start_year": 2020,
   "open_year": 2023,
   "power_mw_now": 284,
   "power_mw_full": 284,
   "full_build_date": "2024-08",
   "capex_bn_full": 9.0,
   "water_mgd": 0.088,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "2025 Environmental Report",
     "u": "https://sustainability.google/reports/google-2025-environmental-report/"
    },
    {
     "t": "Draft basis of air permit with details of cooling towers",
     "u": "https://drive.google.com/file/d/1nONzuLnpMPST0bOINDKXmSZ0ANlynYY0/view?usp=sharing"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2020": [
     "c",
     0
    ],
    "2021": [
     "c",
     0
    ],
    "2022": [
     "c",
     0
    ],
    "2023": [
     "o",
     95
    ],
    "2024": [
     "o",
     284
    ],
    "2025": [
     "o",
     284
    ],
    "2026": [
     "o",
     284
    ],
    "2027": [
     "o",
     284
    ],
    "2028": [
     "o",
     284
    ],
    "2029": [
     "o",
     284
    ],
    "2030": [
     "o",
     284
    ]
   }
  },
  {
   "id": "meta-gallatin",
   "name": "Meta Gallatin",
   "operator": "Meta",
   "users": "Meta",
   "project": "",
   "lat": 36.3883,
   "lng": -86.4476,
   "loc_precision": "city",
   "place": "1 Meta Lp, Gallatin, TN 37066",
   "state": "Tennessee",
   "country": "United States",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2026,
   "power_mw_now": 114,
   "power_mw_full": 114,
   "full_build_date": "2026-08",
   "capex_bn_full": 3.3,
   "water_mgd": 0.0,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Meta fact sheet",
     "u": "https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Gallatin-Data-Center.pdf"
    },
    {
     "t": "Campus extension announcement",
     "u": "https://www.gallatingetsit.com/newsroom/meta-approved-for-another-data-center-on-gallatin-campus"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     114
    ],
    "2027": [
     "o",
     114
    ],
    "2028": [
     "o",
     114
    ],
    "2029": [
     "o",
     114
    ],
    "2030": [
     "o",
     114
    ]
   }
  },
  {
   "id": "coreweave-ellendale-nd",
   "name": "CoreWeave Ellendale ND",
   "operator": "CoreWeave",
   "users": "OpenAI",
   "project": "",
   "lat": 46.0103,
   "lng": -98.5687,
   "loc_precision": "address",
   "place": "9685 87th Ave SE, Ellendale, ND 58436",
   "state": "North Dakota",
   "country": "United States",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2025,
   "power_mw_now": 88,
   "power_mw_full": 520,
   "full_build_date": "2027-06",
   "capex_bn_full": 15.2,
   "water_mgd": 0.0,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Applied Digital Announces 250MW AI Data Center Lease With CoreWeave",
     "u": "https://ir.applieddigital.com/news-events/press-releases/detail/123/applied-digital-announces-250mw-ai-data-center-lease-with"
    },
    {
     "t": "SEC 8k Filing with Applied Digital",
     "u": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001641172-25-013199/form8-k.htm"
    },
    {
     "t": "Applied Digital Delivers Second Building at Polaris Forge 1",
     "u": "https://ir.applieddigital.com/news-events/press-releases/detail/157/applied-digital-delivers-second-building-at-polaris-forge-1"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     88
    ],
    "2026": [
     "o",
     114
    ],
    "2027": [
     "o",
     520
    ],
    "2028": [
     "o",
     520
    ],
    "2029": [
     "o",
     520
    ],
    "2030": [
     "o",
     520
    ]
   }
  },
  {
   "id": "meta-sarpy",
   "name": "Meta Sarpy",
   "operator": "Meta",
   "users": "Meta",
   "project": "",
   "lat": 41.0818,
   "lng": -96.1311,
   "loc_precision": "city/county",
   "place": "14436-14998 Fairview Rd, Springfield, NE 68059, USA",
   "state": "Nebraska",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2026,
   "power_mw_now": 105,
   "power_mw_full": 105,
   "full_build_date": "2026-08",
   "capex_bn_full": 3.0,
   "water_mgd": 0.0,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Meta Sarpy info sheet (PDF)",
     "u": "https://datacenters.atmeta.com/asset/sarpy-data-center-info-sheet/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     105
    ],
    "2027": [
     "o",
     105
    ],
    "2028": [
     "o",
     105
    ],
    "2029": [
     "o",
     105
    ],
    "2030": [
     "o",
     105
    ]
   }
  },
  {
   "id": "coreweave-chester-va",
   "name": "CoreWeave Chester VA",
   "operator": "CoreWeave",
   "users": "OpenAI",
   "project": "",
   "lat": 37.3489,
   "lng": -77.4384,
   "loc_precision": "city",
   "place": "1401 Meadowville Technology Parkway, Chester, VA",
   "state": "Virginia",
   "country": "United States",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2024,
   "power_mw_now": 114,
   "power_mw_full": 197,
   "full_build_date": "2027-06",
   "capex_bn_full": 4.3,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Chirisa secures $200 million loan to fit out VA Data center for CoreWeave",
     "u": "https://www.datacenterdynamics.com/en/news/chirisa-secures-200-million-loan-to-fit-out-virginia-data-center-for-coreweave/"
    },
    {
     "t": "Blue Owl-led JV secures $750m to build out data centers for CoreWeave",
     "u": "https://www.datacenterdynamics.com/en/news/blue-owl-led-jv-secures-750m-to-build-out-data-centers-for-coreweave/"
    },
    {
     "t": "Chirisa offers former Capital One data center in Virginia to hyperscalers",
     "u": "https://www.datacenterdynamics.com/en/news/chirisa-offers-former-capital-one-data-center-in-virginia-to-hyperscalers/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "o",
     38
    ],
    "2025": [
     "o",
     38
    ],
    "2026": [
     "o",
     114
    ],
    "2027": [
     "o",
     197
    ],
    "2028": [
     "o",
     197
    ],
    "2029": [
     "o",
     197
    ],
    "2030": [
     "o",
     197
    ]
   }
  },
  {
   "id": "oracle-batam",
   "name": "Oracle Batam",
   "operator": "Oracle",
   "users": "Tencent",
   "project": "",
   "lat": 1.1031,
   "lng": 104.0384,
   "loc_precision": "city/county",
   "place": "Batam, Indonesia",
   "state": "",
   "country": "Indonesia",
   "status": "operating",
   "start_year": 2022,
   "open_year": 2025,
   "power_mw_now": 94,
   "power_mw_full": 94,
   "full_build_date": "2026-04",
   "capex_bn_full": 2.7,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "DayOne discloses a partnership with \"leading global tech company\" at their Batam campus",
     "u": "https://www.linkedin.com/posts/digitaltransformation-datacenter-ugcPost-7264614420276744194-aQSa/"
    },
    {
     "t": "Oracle announces their Batam cloud compute region",
     "u": "https://docs.oracle.com/en-us/iaas/releasenotes/oci/new-region-batam.htm"
    },
    {
     "t": "Oracle is later reported to be leasing DayOne data centers in Indonesia",
     "u": "https://www.datacenterdynamics.com/en/news/oracle-establishes-cloud-presence-in-indonesia/"
    },
    {
     "t": "DayOne video stating 72 MW of IT power and NVIDIA partnership, and showing cooling tower fan movement",
     "u": "https://www.linkedin.com/posts/dayonedc-datacenter-batam-ugcPost-7450899048925986816-Wxqu/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     43
    ],
    "2026": [
     "o",
     94
    ],
    "2027": [
     "o",
     94
    ],
    "2028": [
     "o",
     94
    ],
    "2029": [
     "o",
     94
    ],
    "2030": [
     "o",
     94
    ]
   }
  },
  {
   "id": "aws-berwick",
   "name": "AWS Berwick",
   "operator": "Amazon",
   "users": "Anthropic",
   "project": "Project Rainier",
   "lat": 41.0838,
   "lng": -76.1435,
   "loc_precision": "address",
   "place": "1125 Electron Ave, Berwick, PA 18603",
   "state": "Pennsylvania",
   "country": "United States",
   "status": "operating",
   "start_year": 2021,
   "open_year": 2025,
   "power_mw_now": 139,
   "power_mw_full": 212,
   "full_build_date": "2027-08",
   "capex_bn_full": 6.4,
   "water_mgd": 0.129,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "Campus sits next to the Susquehanna nuclear plant. Talen Energy agreed in June 2025 to sell Amazon up to 1,920 MW of nuclear power through 2042, ramping to full volume by 2032.",
   "basis": "epoch",
   "sources": [
    {
     "t": "Talen Energy release, June 11, 2025 (SEC filing)",
     "u": "https://www.sec.gov/Archives/edgar/data/1622536/000162828025030559/a20250611pressreleasebusin.htm"
    },
    {
     "t": "NYT reporting that one of the Project Rainier sites may be in Pennsylvania",
     "u": "https://www.nytimes.com/2025/06/24/technology/amazon-ai-data-centers.html"
    },
    {
     "t": "Talen SEC filing detailing the $650M sale of the Cumulus data center campus to AWS",
     "u": "https://www.sec.gov/Archives/edgar/data/1622536/000162828024036935/tln-20240630.htm"
    },
    {
     "t": "Pennsylvania PUC filing describing the planned 16-building AWS data center development",
     "u": "https://www.puc.pa.gov/pcdocs/1861638.pdf"
    },
    {
     "t": "SRBC filing covering AWS campus expansion and water-use plans",
     "u": "https://www.srbc.gov/about/news/docs/2025-159-final-public-comment-responses-20260128.pdf"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2021": [
     "c",
     0
    ],
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     66
    ],
    "2026": [
     "o",
     139
    ],
    "2027": [
     "o",
     212
    ],
    "2028": [
     "o",
     212
    ],
    "2029": [
     "o",
     212
    ],
    "2030": [
     "o",
     212
    ]
   }
  },
  {
   "id": "huawei-horinger",
   "name": "Huawei Horinger",
   "operator": "Huawei",
   "users": "",
   "project": "",
   "lat": 40.2952,
   "lng": 111.9045,
   "loc_precision": "city/county",
   "place": "Huawei, Horinger, China",
   "state": "",
   "country": "China",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2025,
   "power_mw_now": 212,
   "power_mw_full": 439,
   "full_build_date": "2028-02",
   "capex_bn_full": 13.3,
   "water_mgd": 0.0,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     53
    ],
    "2026": [
     "o",
     270
    ],
    "2027": [
     "o",
     270
    ],
    "2028": [
     "o",
     439
    ],
    "2029": [
     "o",
     439
    ],
    "2030": [
     "o",
     439
    ]
   }
  },
  {
   "id": "coreweave-marble-nc",
   "name": "CoreWeave Marble NC",
   "operator": "CoreWeave",
   "users": "OpenAI",
   "project": "",
   "lat": 35.185,
   "lng": -83.9141,
   "loc_precision": "address",
   "place": "155 Palmer Ln, Marble, NC 28905",
   "state": "North Carolina",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2026,
   "power_mw_now": 91,
   "power_mw_full": 91,
   "full_build_date": "2026-05",
   "capex_bn_full": 2.5,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Core Scientific - Q1 2026 Fiscal Earnings Call",
     "u": "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-26-031246/q1fy26earningsdeck.htm"
    },
    {
     "t": "Core Scientific - Official Marble, NC Datacenter page",
     "u": "https://corescientific.com/high-density-data-centers/marble-nc/"
    },
    {
     "t": "Core Scientific - Q1 2025 Earnings Presentation",
     "u": "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-25-023161/exhibit992-q12025earning.htm"
    },
    {
     "t": "Core Scientific - June 2024 Investor and Analyst Day",
     "u": "https://www.sec.gov/Archives/edgar/data/1839341/000162828024027821/corescientificinvestorda.htm"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     91
    ],
    "2027": [
     "o",
     91
    ],
    "2028": [
     "o",
     91
    ],
    "2029": [
     "o",
     91
    ],
    "2030": [
     "o",
     91
    ]
   }
  },
  {
   "id": "core42-lake-mariner",
   "name": "Core42 Lake Mariner",
   "operator": "Core42",
   "users": "G42",
   "project": "",
   "lat": 43.3587,
   "lng": -78.6041,
   "loc_precision": "address",
   "place": "7725 Lake Rd, Barker, NY 14012",
   "state": "New York",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2025,
   "power_mw_now": 58,
   "power_mw_full": 58,
   "full_build_date": "2026-03",
   "capex_bn_full": 2.2,
   "water_mgd": 0.0,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Terawulf press release with details of Core42 lease for Buildings 1-2",
     "u": "https://investors.terawulf.com/news-events/press-releases/detail/99/terawulf-to-deliver-over-70-mw-of-data-center"
    },
    {
     "t": "Terawulf press release with details and timeline for Buildings 1-5",
     "u": "https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results"
    },
    {
     "t": "DCD article suggesting that Fluidstack will deploy Google TPUs at Lake Mariner",
     "u": "https://www.datacenterdynamics.com/en/news/google-offers-its-tpus-to-ai-cloud-providers-report/"
    },
    {
     "t": "Announcement of Anthropic-Fluidstack partnership, including data center(s) in New York",
     "u": "https://www.anthropic.com/news/anthropic-invests-50-billion-in-american-ai-infrastructure"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     19
    ],
    "2026": [
     "o",
     58
    ],
    "2027": [
     "o",
     58
    ],
    "2028": [
     "o",
     58
    ],
    "2029": [
     "o",
     58
    ],
    "2030": [
     "o",
     58
    ]
   }
  },
  {
   "id": "microsoft-sat40",
   "name": "Microsoft SAT40",
   "operator": "Microsoft",
   "users": "",
   "project": "",
   "lat": 29.4246,
   "lng": -98.4951,
   "loc_precision": "city",
   "place": "15000 Lambda Drive, San Antonio, TX 78245",
   "state": "Texas",
   "country": "United States",
   "status": "operating",
   "start_year": 2018,
   "open_year": 2024,
   "power_mw_now": 106,
   "power_mw_full": 106,
   "full_build_date": "2025-12",
   "capex_bn_full": 2.8,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "TDLR for SAT40 (Building 2)",
     "u": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023013247"
    },
    {
     "t": "TDLR for a set of three long buildings, which includes the first building we believe is for AI (Building 1)",
     "u": "https://www.tdlr.texas.gov/TABS/Search/Project/EABPRJB8824650"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2018": [
     "c",
     0
    ],
    "2019": [
     "c",
     0
    ],
    "2020": [
     "c",
     0
    ],
    "2021": [
     "c",
     0
    ],
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "o",
     66
    ],
    "2025": [
     "o",
     106
    ],
    "2026": [
     "o",
     106
    ],
    "2027": [
     "o",
     106
    ],
    "2028": [
     "o",
     106
    ],
    "2029": [
     "o",
     106
    ],
    "2030": [
     "o",
     106
    ]
   }
  },
  {
   "id": "stack-infrastructure-nva02",
   "name": "STACK Infrastructure NVA02",
   "operator": "",
   "users": "",
   "project": "",
   "lat": 38.7464,
   "lng": -77.5369,
   "loc_precision": "address",
   "place": "9590 Hornbaker Rd, Manassas, VA 20109",
   "state": "Virginia",
   "country": "United States",
   "status": "operating",
   "start_year": 2019,
   "open_year": 2024,
   "power_mw_now": 118,
   "power_mw_full": 487,
   "full_build_date": "2028-01",
   "capex_bn_full": 13.2,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Official website for NVA02, showcasing their project.",
     "u": "https://www.stackinfra.com/locations/americas/northern-virginia/nva02/"
    },
    {
     "t": "Most recent official schematic of the NVA02 campus.",
     "u": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-northern-virginia-data-center-campus/"
    },
    {
     "t": "Air quality permit from the state of Virginia.",
     "u": "https://www.deq.virginia.gov/home/showpublisheddocument/25966/638633868679100000"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2019": [
     "c",
     0
    ],
    "2020": [
     "c",
     0
    ],
    "2021": [
     "c",
     0
    ],
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "o",
     118
    ],
    "2025": [
     "o",
     118
    ],
    "2026": [
     "o",
     118
    ],
    "2027": [
     "o",
     118
    ],
    "2028": [
     "o",
     487
    ],
    "2029": [
     "o",
     487
    ],
    "2030": [
     "o",
     487
    ]
   }
  },
  {
   "id": "microsoft-nebius-new-jersey",
   "name": "Microsoft-Nebius New Jersey",
   "operator": "Nebius",
   "users": "Microsoft",
   "project": "",
   "lat": 39.4282,
   "lng": -75.0184,
   "loc_precision": "address",
   "place": "3963 S Lincoln Ave, Vineland, New Jersey",
   "state": "New Jersey",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2026,
   "power_mw_now": 70,
   "power_mw_full": 70,
   "full_build_date": "2026-04",
   "capex_bn_full": 1.9,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Nebius: up to 300 MW capacity at new New Jersey data center",
     "u": "https://nebius.com/newsroom/nebius-accelerates-us-expansion-adding-up-to-300-mw-capacity-at-new-data-center-in-new-jersey"
    },
    {
     "t": "DataOne and Nebius partner for 300 MW AI data center (Data Centre Magazine)",
     "u": "https://datacentremagazine.com/articles/dataone-and-nebius-partner-for-new-300mw-ai-data-centre"
    },
    {
     "t": "Microsoft secures 100,000 NVIDIA GB300 via Nebius deal (Tom's Hardware)",
     "u": "https://www.tomshardware.com/tech-industry/artificial-intelligence/microsoft-inks-usd33-billion-in-deals-with-neoclouds-like-nebius-coreweave-nebius-deal-alone-secures-100-000-nvidia-gb300-chips-for-internal-use"
    },
    {
     "t": "DataOne CEO on first 50 MW delivery to Nebius (LinkedIn)",
     "u": "https://www.linkedin.com/feed/update/urn:li:activity:7367650153555591168/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     70
    ],
    "2027": [
     "o",
     70
    ],
    "2028": [
     "o",
     70
    ],
    "2029": [
     "o",
     70
    ],
    "2030": [
     "o",
     70
    ]
   }
  },
  {
   "id": "huawei-wuhu",
   "name": "Huawei Wuhu",
   "operator": "Huawei",
   "users": "",
   "project": "",
   "lat": 31.1801,
   "lng": 118.2142,
   "loc_precision": "city/county",
   "place": "Wuhu, China",
   "state": "",
   "country": "China",
   "status": "operating",
   "start_year": 2022,
   "open_year": 2025,
   "power_mw_now": 256,
   "power_mw_full": 589,
   "full_build_date": "2027-12",
   "capex_bn_full": 17.2,
   "water_mgd": 0.0,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     202
    ],
    "2026": [
     "o",
     468
    ],
    "2027": [
     "o",
     589
    ],
    "2028": [
     "o",
     589
    ],
    "2029": [
     "o",
     589
    ],
    "2030": [
     "o",
     589
    ]
   }
  },
  {
   "id": "coreweave-norway",
   "name": "CoreWeave Norway",
   "operator": "CoreWeave",
   "users": "OpenAI",
   "project": "",
   "lat": 58.2576,
   "lng": 7.8921,
   "loc_precision": "address",
   "place": "Stølevegen 39, 4715 Øvrebø, Norway",
   "state": "",
   "country": "Norway",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2025,
   "power_mw_now": 55,
   "power_mw_full": 55,
   "full_build_date": "2025-07",
   "capex_bn_full": 1.6,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "CoreWeave/Bulk N01 partnership announcement",
     "u": "https://bulkinfrastructure.com/newsroom/coreweave-partners-with-bulk-infrastructure"
    },
    {
     "t": "Bulk N01 expansion announcement",
     "u": "https://bulkinfrastructure.com/newsroom/bulk-data-centers-unveils-plan-for-data-center-expansion-following-unprecedented-demand"
    },
    {
     "t": "Bulk N01 campus brochure with 5-data-center plan",
     "u": "https://bulkinfrastructure.com/uploads/N01-Campus_Brochure_May24.pdf"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     55
    ],
    "2026": [
     "o",
     55
    ],
    "2027": [
     "o",
     55
    ],
    "2028": [
     "o",
     55
    ],
    "2029": [
     "o",
     55
    ],
    "2030": [
     "o",
     55
    ]
   }
  },
  {
   "id": "nebius-mantsala",
   "name": "Nebius Mantsala",
   "operator": "Nebius",
   "users": "Microsoft",
   "project": "",
   "lat": 60.6353,
   "lng": 25.3159,
   "loc_precision": "city/county",
   "place": "Mäntsälä, Finland",
   "state": "",
   "country": "Finland",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2024,
   "power_mw_now": 90,
   "power_mw_full": 196,
   "full_build_date": "2027-12",
   "capex_bn_full": 5.5,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Nebius to triple capacity of Mantsala campus to 75 MW",
     "u": "https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw"
    },
    {
     "t": "Nebius announcing deployment of first GB300 NVL72 systems in Europe",
     "u": "https://nebius.com/blog/posts/first-live-nvidia-gb300-nvl72-deployment-in-europe"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "o",
     48
    ],
    "2025": [
     "o",
     48
    ],
    "2026": [
     "o",
     90
    ],
    "2027": [
     "o",
     196
    ],
    "2028": [
     "o",
     196
    ],
    "2029": [
     "o",
     196
    ],
    "2030": [
     "o",
     196
    ]
   }
  },
  {
   "id": "envision-galaxy-ulanqab",
   "name": "Envision Galaxy Ulanqab",
   "operator": "",
   "users": "",
   "project": "",
   "lat": 40.9903,
   "lng": 113.1316,
   "loc_precision": "city/county",
   "place": "Ulanqab, Inner Mongolia, China",
   "state": "",
   "country": "China",
   "status": "operating",
   "start_year": 2025,
   "open_year": 2026,
   "power_mw_now": 153,
   "power_mw_full": 612,
   "full_build_date": "2027-12",
   "capex_bn_full": 17.8,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     153
    ],
    "2027": [
     "o",
     612
    ],
    "2028": [
     "o",
     612
    ],
    "2029": [
     "o",
     612
    ],
    "2030": [
     "o",
     612
    ]
   }
  },
  {
   "id": "southgate-melbourne",
   "name": "Southgate Melbourne",
   "operator": "Firmus",
   "users": "",
   "project": "",
   "lat": -37.8142,
   "lng": 144.9632,
   "loc_precision": "city/county",
   "place": "Melbourne, Victoria, Australia",
   "state": "",
   "country": "Australia",
   "status": "operating",
   "start_year": 2022,
   "open_year": 2026,
   "power_mw_now": 57,
   "power_mw_full": 57,
   "full_build_date": "2026-08",
   "capex_bn_full": 1.6,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Firmus Expands Project Southgate Across Australia",
     "u": "https://firmus.co/newsroom/southgate-expansion"
    },
    {
     "t": "Firmus Signs Multi-Year Agreement with Global Hyperscale Customer at Project Southgate",
     "u": "https://firmus.co/newsroom/firmus-signs-multi-year-agreement-with-global-hyperscale-customer-at-project-southgate"
    },
    {
     "t": "CDC Melbourne",
     "u": "https://cdc.com/locations/melbourne/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     57
    ],
    "2027": [
     "o",
     57
    ],
    "2028": [
     "o",
     57
    ],
    "2029": [
     "o",
     57
    ],
    "2030": [
     "o",
     57
    ]
   }
  },
  {
   "id": "stream-phoenix",
   "name": "Stream Phoenix",
   "operator": "",
   "users": "",
   "project": "",
   "lat": 33.4195,
   "lng": -112.36,
   "loc_precision": "address",
   "place": "2950 S. Litchfield Road",
   "state": "Arizona",
   "country": "United States",
   "status": "operating",
   "start_year": 2022,
   "open_year": 2026,
   "power_mw_now": 77,
   "power_mw_full": 267,
   "full_build_date": "2030-01",
   "capex_bn_full": 8.3,
   "water_mgd": 0.0,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Official page for the data center.",
     "u": "https://www.streamdatacenters.com/locations/phoenix/"
    },
    {
     "t": "Official pre-construction planning document.",
     "u": "https://www.streamdatacenters.com/wp-content/uploads/2026/01/SDC-Goodyear-CaseStudy-251218.pdf"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     77
    ],
    "2027": [
     "o",
     77
    ],
    "2028": [
     "o",
     77
    ],
    "2029": [
     "o",
     77
    ],
    "2030": [
     "o",
     267
    ]
   }
  },
  {
   "id": "microsoft-sat14",
   "name": "Microsoft SAT14",
   "operator": "Microsoft",
   "users": "",
   "project": "",
   "lat": 29.4729,
   "lng": -98.6818,
   "loc_precision": "address",
   "place": "3545 Wiseman Boulevard, San Antonio, TX 78251",
   "state": "Texas",
   "country": "United States",
   "status": "operating",
   "start_year": 2022,
   "open_year": 2024,
   "power_mw_now": 66,
   "power_mw_full": 66,
   "full_build_date": "2026-03",
   "capex_bn_full": 1.8,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Phase 1 TDLR",
     "u": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019142"
    },
    {
     "t": "Phase 2 TDLR",
     "u": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019471"
    },
    {
     "t": "Phase 3 TDLR",
     "u": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019588"
    },
    {
     "t": "Phase 4 TDLR",
     "u": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019686"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "o",
     26
    ],
    "2025": [
     "o",
     26
    ],
    "2026": [
     "o",
     66
    ],
    "2027": [
     "o",
     66
    ],
    "2028": [
     "o",
     66
    ],
    "2029": [
     "o",
     66
    ],
    "2030": [
     "o",
     66
    ]
   }
  },
  {
   "id": "vantage-tx1",
   "name": "Vantage TX1",
   "operator": "",
   "users": "",
   "project": "",
   "lat": 29.4169,
   "lng": -98.7902,
   "loc_precision": "address",
   "place": "14720 Omicron Dr, San Antonio, TX 78245",
   "state": "Texas",
   "country": "United States",
   "status": "operating",
   "start_year": 2023,
   "open_year": 2026,
   "power_mw_now": 45,
   "power_mw_full": 179,
   "full_build_date": "2027-08",
   "capex_bn_full": 4.8,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Construction Permitting for TX11",
     "u": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024007561"
    },
    {
     "t": "Construction Permitting for TX12",
     "u": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026001234"
    },
    {
     "t": "Air quality permitting that references TX13",
     "u": "https://drive.google.com/file/d/1rbF-RT5Sq-iZ26hK5cKzbM2K4Vq2vObY/view?usp=sharing"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     45
    ],
    "2027": [
     "o",
     179
    ],
    "2028": [
     "o",
     179
    ],
    "2029": [
     "o",
     179
    ],
    "2030": [
     "o",
     179
    ]
   }
  },
  {
   "id": "coreweave-dalton-1-2",
   "name": "CoreWeave Dalton 1 & 2",
   "operator": "CoreWeave",
   "users": "OpenAI",
   "project": "",
   "lat": 34.7134,
   "lng": -84.9522,
   "loc_precision": "address",
   "place": "2205 Industrial South Rd, Dalton, GA, 30721",
   "state": "Georgia",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2026,
   "power_mw_now": 40,
   "power_mw_full": 40,
   "full_build_date": "2026-02",
   "capex_bn_full": 1.1,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Core Scientific page",
     "u": "https://corescientific.com/high-density-data-centers/dalton-ga-dnn1-2/"
    },
    {
     "t": "SEC filing with power utility information",
     "u": "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001140361-25-039864/0001140361-25-039864.pdf"
    },
    {
     "t": "DCD article",
     "u": "https://www.datacenterdynamics.com/en/news/core-scientific-plans-new-ai-data-centers-in-dalton-georgia/"
    },
    {
     "t": "Core Scientific presentation",
     "u": "https://www.sec.gov/Archives/edgar/data/1839341/000162828024027821/corescientificinvestorda.htm"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     40
    ],
    "2027": [
     "o",
     40
    ],
    "2028": [
     "o",
     40
    ],
    "2029": [
     "o",
     40
    ],
    "2030": [
     "o",
     40
    ]
   }
  },
  {
   "id": "alibaba-zhangbei",
   "name": "Alibaba Zhangbei",
   "operator": "Alibaba",
   "users": "Alibaba",
   "project": "",
   "lat": 41.2878,
   "lng": 114.7693,
   "loc_precision": "city/county",
   "place": "Alibaba Zhangbei Yun Calculation Data Center, Zhangbei County, Zhangjiakou, Hebei, China, 076471",
   "state": "",
   "country": "China",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2025,
   "power_mw_now": 203,
   "power_mw_full": 203,
   "full_build_date": "2026-01",
   "capex_bn_full": 6.4,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     102
    ],
    "2026": [
     "o",
     203
    ],
    "2027": [
     "o",
     203
    ],
    "2028": [
     "o",
     203
    ],
    "2029": [
     "o",
     203
    ],
    "2030": [
     "o",
     203
    ]
   }
  },
  {
   "id": "start-campus-sines-data-campus",
   "name": "Start Campus Sines Data Campus",
   "operator": "Nscale",
   "users": "Microsoft",
   "project": "",
   "lat": 37.9565,
   "lng": -8.869,
   "loc_precision": "city/county",
   "place": "Start Campus - Sustainable Data Center Services, Sines, Portugal",
   "state": "",
   "country": "Portugal",
   "status": "operating",
   "start_year": 2022,
   "open_year": 2026,
   "power_mw_now": 40,
   "power_mw_full": 280,
   "full_build_date": "2027-09",
   "capex_bn_full": 8.8,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Website for the site",
     "u": "https://www.startcampus.pt/sines"
    },
    {
     "t": "Factsheet for the full site",
     "u": "https://23712035.hs-sites.com/hubfs/SINES%20DC_1.2%20GW%20DC%20Campus_V2.pdf?hsCtaAttrib=194868835084"
    },
    {
     "t": "Article detailing Microsoft collaboration and GPU amounts",
     "u": "https://lp.startcampus.pt/start-campus-hosts-eus-first-nvidia-gb300-chips-with-nscale-for-microsoft"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     40
    ],
    "2027": [
     "o",
     280
    ],
    "2028": [
     "o",
     280
    ],
    "2029": [
     "o",
     280
    ],
    "2030": [
     "o",
     280
    ]
   }
  },
  {
   "id": "xai-qts-atlanta",
   "name": "xAI QTS Atlanta",
   "operator": "SpaceXAI",
   "users": "SpaceXAI",
   "project": "",
   "lat": 33.7772,
   "lng": -84.4195,
   "loc_precision": "address",
   "place": "1025 Jefferson Street NW, Atlanta, GA 30318",
   "state": "Georgia",
   "country": "United States",
   "status": "operating",
   "start_year": 2024,
   "open_year": 2025,
   "power_mw_now": 24,
   "power_mw_full": 24,
   "full_build_date": "2025-02",
   "capex_bn_full": 0.7,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Develop Fulton bond fact sheet: X Corp Generative AI Equipment Project (Jan 23, 2024)",
     "u": "https://www.developfultoncounty.com/meetings-and-minutes_239_547601452.pdf"
    },
    {
     "t": "Business Insider: Elon Musk's new Atlanta data center for xAI has $700 million in AI equipment",
     "u": "https://www.businessinsider.com/xai-elon-musk-x-new-atlanta-data-center-2025-2"
    },
    {
     "t": "Fortune: Elon Musk's xAI is sharing X's equipment at its Atlanta data center (Jan 24, 2025)",
     "u": "https://fortune.com/2025/01/24/elon-musk-xai-sharing-x-equipment-gpus-datacenter-georgia-tax-breaks-documents/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "o",
     24
    ],
    "2026": [
     "o",
     24
    ],
    "2027": [
     "o",
     24
    ],
    "2028": [
     "o",
     24
    ],
    "2029": [
     "o",
     24
    ],
    "2030": [
     "o",
     24
    ]
   }
  },
  {
   "id": "nscale-keflavik",
   "name": "Nscale Keflavik",
   "operator": "Nscale",
   "users": "",
   "project": "",
   "lat": 63.977,
   "lng": -22.5755,
   "loc_precision": "address",
   "place": "Valhallarbraut 868, 262 Reykjanesbær, Iceland",
   "state": "",
   "country": "Iceland",
   "status": "operating",
   "start_year": 2022,
   "open_year": 2026,
   "power_mw_now": 7,
   "power_mw_full": 13,
   "full_build_date": "2026-12",
   "capex_bn_full": 0.4,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Nscale / Verne 15 MW deployment announcement",
     "u": "https://www.nscale.com/press-releases/nscale-and-verne"
    },
    {
     "t": "Nscale GB300 NVL72 production cluster confirmation",
     "u": "https://www.nscale.com/blog/nscale-achieves-nvidia-exemplar-cloud-status-on-nvidia-gb300-nvl72"
    },
    {
     "t": "Verne Keflavík campus specifications",
     "u": "https://www.verne.co/iceland"
    },
    {
     "t": "Lenovo Nscale Iceland AI infrastructure case study",
     "u": "https://www.lenovo.com/content/dam/lenovo/iso/customer-references-coe/global/en/case-studies/nscale-nvidia/lenovo_nscale_casestudy.pdf"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2022": [
     "c",
     0
    ],
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     13
    ],
    "2027": [
     "o",
     13
    ],
    "2028": [
     "o",
     13
    ],
    "2029": [
     "o",
     13
    ],
    "2030": [
     "o",
     13
    ]
   }
  },
  {
   "id": "anthropic-barber-lake",
   "name": "Anthropic Barber Lake",
   "operator": "Cipher Mining",
   "users": "Anthropic",
   "project": "",
   "lat": 32.393,
   "lng": -100.8635,
   "loc_precision": "city/county",
   "place": "Colorado City, Texas",
   "state": "Texas",
   "country": "United States",
   "status": "construction",
   "start_year": 2025,
   "open_year": 2026,
   "power_mw_now": null,
   "power_mw_full": 300,
   "full_build_date": "2027-04",
   "capex_bn_full": 7.8,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Cipher signs 168 MW AI hosting deal with Fluidstack, Google backs it (Sep 2025)",
     "u": "https://www.globenewswire.com/news-release/2025/09/25/3156107/0/en/Cipher-Mining-Signs-168-MW-10-Year-AI-Hosting-Agreement-with-Fluidstack.html"
    },
    {
     "t": "Cipher adds 56 MW gross to reach 300 MW at Barber Lake (Nov 2025)",
     "u": "https://www.globenewswire.com/news-release/2025/11/20/3191801/0/en/Cipher-Mining-Signs-Additional-56-MW-10-Year-AI-Hosting-Agreement-with-Fluidstack.html"
    },
    {
     "t": "Cipher 8-K exhibit: 207 MW total critical IT load (SEC, Nov 2025)",
     "u": "https://www.sec.gov/Archives/edgar/data/1819989/000095010325015073/dp237633_ex9901.htm"
    },
    {
     "t": "Anthropic to expand use of Google Cloud TPUs (Oct 2025)",
     "u": "https://www.googlecloudpresscorner.com/2025-10-23-Anthropic-to-Expand-Use-of-Google-Cloud-TPUs-and-Services"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     244
    ],
    "2027": [
     "o",
     300
    ],
    "2028": [
     "o",
     300
    ],
    "2029": [
     "o",
     300
    ],
    "2030": [
     "o",
     300
    ]
   }
  },
  {
   "id": "coreweave-lancaster-greenfield-site",
   "name": "CoreWeave Lancaster Greenfield site",
   "operator": "CoreWeave",
   "users": "OpenAI",
   "project": "",
   "lat": 40.038,
   "lng": -76.3057,
   "loc_precision": "city/county",
   "place": "216 Greenfield Rd, Lancaster, PA",
   "state": "Pennsylvania",
   "country": "United States",
   "status": "construction",
   "start_year": 2025,
   "open_year": 2027,
   "power_mw_now": null,
   "power_mw_full": 124,
   "full_build_date": "2027-06",
   "capex_bn_full": 3.5,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "CoreWeave announces plans to spend $6 billion on Lancaster data centers",
     "u": "https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx"
    },
    {
     "t": "Machine Investment Group purchases two former printing press sites in Lancaster, Pennsylvania",
     "u": "https://www.datacenterdynamics.com/en/news/machine-investment-acquires-two-printing-press-sites-in-pennsylvania-plans-data-center-redevelopment/?utm_source=datacentermap.com"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2025": [
     "c",
     0
    ],
    "2026": [
     "c",
     0
    ],
    "2027": [
     "o",
     124
    ],
    "2028": [
     "o",
     124
    ],
    "2029": [
     "o",
     124
    ],
    "2030": [
     "o",
     124
    ]
   }
  },
  {
   "id": "coreweave-muskogee-ok",
   "name": "CoreWeave Muskogee OK",
   "operator": "CoreWeave",
   "users": "OpenAI",
   "project": "",
   "lat": 35.6969,
   "lng": -95.3839,
   "loc_precision": "address",
   "place": "1525 W 43rd St S, Muskogee, OK 74401, USA",
   "state": "Oklahoma",
   "country": "United States",
   "status": "construction",
   "start_year": 2024,
   "open_year": 2026,
   "power_mw_now": null,
   "power_mw_full": 181,
   "full_build_date": "2027-12",
   "capex_bn_full": 5.8,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Core Scientific ground breaking announcement",
     "u": "https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center"
    },
    {
     "t": "Port Muskogee ground breaking announcement",
     "u": "https://www.portmuskogee.com/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center/"
    },
    {
     "t": "Air quality permit application",
     "u": "https://applications.deq.ok.gov/permitspublic/storedpermits/9138.pdf"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     98
    ],
    "2027": [
     "o",
     181
    ],
    "2028": [
     "o",
     181
    ],
    "2029": [
     "o",
     181
    ],
    "2030": [
     "o",
     181
    ]
   }
  },
  {
   "id": "crusoe-abilene-expansion",
   "name": "Crusoe Abilene Expansion",
   "operator": "Microsoft",
   "users": "Microsoft",
   "project": "",
   "lat": 32.4942,
   "lng": -99.8009,
   "loc_precision": "address",
   "place": "5502 Spinks Rd, Abilene, TX 79601",
   "state": "Texas",
   "country": "United States",
   "status": "construction",
   "start_year": 2025,
   "open_year": 2027,
   "power_mw_now": null,
   "power_mw_full": 941,
   "full_build_date": "2027-11",
   "capex_bn_full": 25.5,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Bloomberg reporting that Oracle and OpenAI pulled out of expanding to these buildings, NVIDIA and Meta might replace them",
     "u": "https://www.bloomberg.com/news/articles/2026-03-06/oracle-and-openai-end-plans-to-expand-flagship-data-center"
    },
    {
     "t": "Air Permit Application for the buildings, featuring blueprints on p.391",
     "u": "https://www.tceq.texas.gov/assets/public/permitting/air/reports/applications/400428-ac.pdf"
    },
    {
     "t": "Aterio",
     "u": "https://www.aterio.io/blog/stargate-files-for-phase-3-expansion-in-abilene"
    },
    {
     "t": "Partnership Announcement with Microsoft",
     "u": "https://x.com/mustafasuleyman/status/2037547756320141587"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2025": [
     "c",
     0
    ],
    "2026": [
     "c",
     0
    ],
    "2027": [
     "o",
     941
    ],
    "2028": [
     "o",
     941
    ],
    "2029": [
     "o",
     941
    ],
    "2030": [
     "o",
     941
    ]
   }
  },
  {
   "id": "ecodatacenter-2",
   "name": "EcoDataCenter 2",
   "operator": "Mistral AI",
   "users": "Mistral AI",
   "project": "",
   "lat": 60.5251,
   "lng": 15.4138,
   "loc_precision": "address",
   "place": "Kvarnsvedsvägen 420, 784 66 Borlänge, Sweden",
   "state": "",
   "country": "Sweden",
   "status": "construction",
   "start_year": 2025,
   "open_year": 2027,
   "power_mw_now": null,
   "power_mw_full": 67,
   "full_build_date": "2028-06",
   "capex_bn_full": 1.8,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "EcoDataCenter 2 campus overview",
     "u": "https://ecodatacenter.tech/data-center/ecodatacenter2"
    },
    {
     "t": "EcoDataCenter 2025 Annual Report",
     "u": "https://ecodatacenter.tech/hubfs/Annual%20Report%202025_EcoDC%20Holding%20AB_ENG.pdf"
    },
    {
     "t": "EcoDataCenter groundbreaking announcement",
     "u": "https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556"
    },
    {
     "t": "Mistral AI partnership announcement",
     "u": "https://ecodatacenter.tech/press/mistral-ai-and-ecodatacenter-partner-to-build-ai-focused-data-center-in-sweden-3431886"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2025": [
     "c",
     0
    ],
    "2026": [
     "c",
     0
    ],
    "2027": [
     "o",
     34
    ],
    "2028": [
     "o",
     67
    ],
    "2029": [
     "o",
     67
    ],
    "2030": [
     "o",
     67
    ]
   }
  },
  {
   "id": "goodnight",
   "name": "Goodnight",
   "operator": "Google",
   "users": "Google DeepMind",
   "project": "",
   "lat": 35.1081,
   "lng": -101.3627,
   "loc_precision": "city/county",
   "place": "10001 Lima Rd, Claude, TX 79019",
   "state": "Texas",
   "country": "United States",
   "status": "construction",
   "start_year": 2025,
   "open_year": 2027,
   "power_mw_now": null,
   "power_mw_full": 1294,
   "full_build_date": "2027-10",
   "capex_bn_full": 38.1,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Amended tax abatement agreement, with updated blueprints on p.46",
     "u": "https://www.co.armstrong.tx.us/upload/page/5361/Amended_Restated_Consolidated%20Second%20Property%20Tax%20Abatement%20Agreement%20%20GNDC1_ArmstrongCounty.pdf"
    },
    {
     "t": "TABS database, with \"Llano\" data centers in the city of Claude",
     "u": "https://www.tdlr.texas.gov/TABS/Search/"
    },
    {
     "t": "Press release reports Google investing in a new data center in Armstrong County",
     "u": "https://www.reuters.com/business/google-invest-40-billion-new-data-centers-texas-bloomberg-news-reports-2025-11-14/"
    },
    {
     "t": "Original tax abatement agreement, with original blueprints and specs on the last page",
     "u": "https://drive.google.com/file/d/1ky5HhuhU8_JADNB2GziWa4WDRbTU4qtO/view?usp=sharing"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2025": [
     "c",
     0
    ],
    "2026": [
     "c",
     0
    ],
    "2027": [
     "o",
     1294
    ],
    "2028": [
     "o",
     1294
    ],
    "2029": [
     "o",
     1294
    ],
    "2030": [
     "o",
     1294
    ]
   }
  },
  {
   "id": "google-cedar-rapids",
   "name": "Google Cedar Rapids",
   "operator": "Google",
   "users": "Google DeepMind",
   "project": "",
   "lat": 41.9222,
   "lng": -91.7157,
   "loc_precision": "address",
   "place": "5800 EDGEWOOD RD SW CEDAR RAPIDS, IA 52404",
   "state": "Iowa",
   "country": "United States",
   "status": "construction",
   "start_year": 2024,
   "open_year": 2026,
   "power_mw_now": null,
   "power_mw_full": 314,
   "full_build_date": "2027-05",
   "capex_bn_full": 9.9,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "MISO new load announcements",
     "u": "https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf"
    },
    {
     "t": "Permit application",
     "u": "https://www.govonlinesaas.com/LCPH/EasyAir/Public/EnSuite/Shared/Pages/util/StreamDoc.ashx?id=260&type=attachment"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     105
    ],
    "2027": [
     "o",
     314
    ],
    "2028": [
     "o",
     314
    ],
    "2029": [
     "o",
     314
    ],
    "2030": [
     "o",
     314
    ]
   }
  },
  {
   "id": "google-fort-wayne",
   "name": "Google Fort Wayne",
   "operator": "Google",
   "users": "Google DeepMind",
   "project": "",
   "lat": 41.0309,
   "lng": -85.0536,
   "loc_precision": "address",
   "place": "6015 Adams Center Road, Fort Wayne, IN 46806",
   "state": "Indiana",
   "country": "United States",
   "status": "construction",
   "start_year": 2024,
   "open_year": 2026,
   "power_mw_now": null,
   "power_mw_full": 1035,
   "full_build_date": "2028-06",
   "capex_bn_full": 32.7,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Google's plans for wetlands in Fort Wayne",
     "u": "https://www.thelocalfw.com/what-to-know-about-googles-plans-for-wetlands-in-fort-wayne/"
    },
    {
     "t": "Data center's diesel generators",
     "u": "https://www.thelocalfw.com/data-center-diesel-generators/"
    },
    {
     "t": "Project's history and tax abatement",
     "u": "https://www.thelocalfw.com/data-centers-secrecy-and-tax-abatements/"
    },
    {
     "t": "City Council approval",
     "u": "https://citycouncildocuments.acfw.net/documents/download/2023-12-19/R-23-12-02.pdf"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     207
    ],
    "2027": [
     "o",
     621
    ],
    "2028": [
     "o",
     1035
    ],
    "2029": [
     "o",
     1035
    ],
    "2030": [
     "o",
     1035
    ]
   }
  },
  {
   "id": "meta-bowling-green",
   "name": "Meta Bowling Green",
   "operator": "Meta",
   "users": "Meta",
   "project": "",
   "lat": 41.3748,
   "lng": -83.6513,
   "loc_precision": "city",
   "place": "12356 Middleton Pike, Bowling Green, OH 43402",
   "state": "Ohio",
   "country": "United States",
   "status": "construction",
   "start_year": 2024,
   "open_year": 2027,
   "power_mw_now": null,
   "power_mw_full": 570,
   "full_build_date": "2028-01",
   "capex_bn_full": 16.0,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Ohio Power Siting Board announcement",
     "u": "https://archive.ph/lqgZw"
    },
    {
     "t": "Meta letter to Middleton Township",
     "u": "https://drive.google.com/drive/folders/12Cz7AlZt4fJfWevNAWTfq8IyLfNHpajz"
    },
    {
     "t": "Construction notice for new transmission lines to data center substation",
     "u": "https://drive.google.com/file/d/1YBuaFsslxCAZxlJtSI0rXfNsFqddwaHN/view?usp=sharing"
    },
    {
     "t": "Apollo Power Generation Project Letter of Notice Appendix A, with a project timeline",
     "u": "https://drive.google.com/file/d/1L154XKyiHqRzeZj36zqMRkjdG7QIFL41/view?usp=drive_link"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "c",
     0
    ],
    "2027": [
     "o",
     220
    ],
    "2028": [
     "o",
     570
    ],
    "2029": [
     "o",
     570
    ],
    "2030": [
     "o",
     570
    ]
   }
  },
  {
   "id": "meta-hyperion",
   "name": "Meta Hyperion",
   "operator": "Meta",
   "users": "Meta",
   "project": "Hyperion",
   "lat": 32.4676,
   "lng": -91.6268,
   "loc_precision": "city/county",
   "place": "Holly Ridge, LA 71269",
   "state": "Louisiana",
   "country": "United States",
   "status": "construction",
   "start_year": 2024,
   "open_year": 2028,
   "power_mw_now": null,
   "power_mw_full": 2203,
   "full_build_date": "2028-01",
   "capex_bn_full": 61.8,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Data center profile by Meta",
     "u": "https://datacenters.atmeta.com/richland-parish-data-center/"
    },
    {
     "t": "S&P Global ratings research with 2.064 GW campus details",
     "u": "https://www.spglobal.com/ratings/en/regulatory/article/-/view/sourceId/101653176"
    },
    {
     "t": "Entergy's application for generation and transmission resources",
     "u": "https://drive.google.com/file/d/1FLY13apaHy4hI8RNVk9n_nlJpwFHtBrB/view?usp=sharing"
    },
    {
     "t": "MISO update with 1.8 GW substation plan",
     "u": "https://drive.google.com/file/d/1D4eUHwEuirNi0g3IU_xGOti3PcC8fcXi/view?usp=sharing"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "c",
     0
    ],
    "2027": [
     "c",
     0
    ],
    "2028": [
     "o",
     2203
    ],
    "2029": [
     "o",
     2203
    ],
    "2030": [
     "o",
     2203
    ]
   }
  },
  {
   "id": "microsoft-narvik-norway",
   "name": "Microsoft Narvik Norway",
   "operator": "Nscale",
   "users": "Microsoft",
   "project": "",
   "lat": 68.4384,
   "lng": 17.4272,
   "loc_precision": "city/county",
   "place": "Narvik, Norway",
   "state": "",
   "country": "Norway",
   "status": "construction",
   "start_year": 2023,
   "open_year": 2026,
   "power_mw_now": null,
   "power_mw_full": 124,
   "full_build_date": "2026-12",
   "capex_bn_full": 3.5,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Nscale announcing more than 30.000 Rubin GPUs",
     "u": "https://www.nscale.com/press-releases/nscale-microsoft-norway"
    },
    {
     "t": "NScale announcing 230 initial MW and possibly an additional 290MW, mentioning 100.000 Nvidia GPUs",
     "u": "https://www.nscale.com/blog/stargate-norway-laying-the-foundation-for-the-future-of-ai"
    },
    {
     "t": "Local hydropower facilities will fulfill new demand at 4 to 5 cents per unit for electricity",
     "u": "https://time.com/article/2026/06/03/ai-norway-nscale-data-center/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     124
    ],
    "2027": [
     "o",
     124
    ],
    "2028": [
     "o",
     124
    ],
    "2029": [
     "o",
     124
    ],
    "2030": [
     "o",
     124
    ]
   }
  },
  {
   "id": "openai-stargate-lordstown",
   "name": "OpenAI Stargate Lordstown",
   "operator": "Softbank",
   "users": "OpenAI",
   "project": "Stargate",
   "lat": 41.2368,
   "lng": -80.819,
   "loc_precision": "city",
   "place": "2300 Hallock Young Rd, Warren, OH 44481",
   "state": "Ohio",
   "country": "United States",
   "status": "construction",
   "start_year": 2025,
   "open_year": 2027,
   "power_mw_now": null,
   "power_mw_full": 300,
   "full_build_date": "2027-03",
   "capex_bn_full": 8.1,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Announcement of 5 new Stargate sites mentioning Lordstown",
     "u": "https://www.datacenterdynamics.com/en/news/openai-announces-five-more-us-stargate-data-centers-with-oracle-and-softbank/"
    },
    {
     "t": "Water Quality Permitting stating that “manufacturing and assembly” is the main purpose of the construction",
     "u": "https://drive.google.com/file/d/1VfWvb9unUXZs3u4zwBjZjQwtsu91y8i9/view?usp=drivesdk"
    },
    {
     "t": "Stormwater Permitting",
     "u": "https://drive.google.com/file/d/1xl4Ql2jdmKhcYFhn43ymM2TJ56Z8cInL/view?usp=drivesdk"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2025": [
     "c",
     0
    ],
    "2026": [
     "c",
     0
    ],
    "2027": [
     "o",
     300
    ],
    "2028": [
     "o",
     300
    ],
    "2029": [
     "o",
     300
    ],
    "2030": [
     "o",
     300
    ]
   }
  },
  {
   "id": "openai-stargate-michigan",
   "name": "OpenAI Stargate Michigan",
   "operator": "Oracle",
   "users": "OpenAI",
   "project": "Stargate",
   "lat": 42.1245,
   "lng": -83.8386,
   "loc_precision": "city/county",
   "place": "Saline Township, Washtenaw County, Michigan",
   "state": "Michigan",
   "country": "United States",
   "status": "construction",
   "start_year": 2025,
   "open_year": 2028,
   "power_mw_now": null,
   "power_mw_full": 1383,
   "full_build_date": "2028-12",
   "capex_bn_full": 37.4,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Related Digital website for this site ",
     "u": "https://www.related-digital.com/michigan"
    },
    {
     "t": "Michigan Public Service Commission Energy Contract Approval, reports 1,383 MW as the site capacity",
     "u": "https://www.michigan.gov/mpsc/commission/news-releases/2025/12/18/mpsc-approves-dte-electric-energy-contracts-for-data-center"
    },
    {
     "t": "DTE Electric’s contract approval ",
     "u": "https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001MH71XAAT"
    },
    {
     "t": "Website with more details for locals about the site",
     "u": "https://www.thesalinebarn.com/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2025": [
     "c",
     0
    ],
    "2026": [
     "c",
     0
    ],
    "2027": [
     "c",
     0
    ],
    "2028": [
     "o",
     1383
    ],
    "2029": [
     "o",
     1383
    ],
    "2030": [
     "o",
     1383
    ]
   }
  },
  {
   "id": "openai-stargate-milam",
   "name": "OpenAI Stargate Milam",
   "operator": "Softbank",
   "users": "OpenAI",
   "project": "Stargate",
   "lat": 30.7627,
   "lng": -96.9982,
   "loc_precision": "city/county",
   "place": "Milam County, Texas",
   "state": "Texas",
   "country": "United States",
   "status": "construction",
   "start_year": 2025,
   "open_year": null,
   "power_mw_now": null,
   "power_mw_full": 1200,
   "full_build_date": "2028-12",
   "capex_bn_full": 32.5,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Data Center Dynamics article on the site",
     "u": "https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/"
    },
    {
     "t": "SB Energy article, source for 1.2 GW capacity ",
     "u": "https://sbenergy.com/openai-and-softbank-group-partner-with-sb-energy/"
    },
    {
     "t": "TDLR page for the first building of the site, indicating construction completion date",
     "u": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026017746"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2025": [
     "c",
     0
    ],
    "2026": [
     "c",
     0
    ],
    "2027": [
     "c",
     0
    ],
    "2028": [
     "c",
     1200
    ],
    "2029": [
     "c",
     1200
    ],
    "2030": [
     "c",
     1200
    ]
   }
  },
  {
   "id": "openai-stargate-new-mexico",
   "name": "OpenAI Stargate New Mexico",
   "operator": "Oracle",
   "users": "OpenAI",
   "project": "Stargate",
   "lat": 31.87,
   "lng": -106.6866,
   "loc_precision": "city/county",
   "place": "Santa Teresa, New Mexico",
   "state": "New Mexico",
   "country": "United States",
   "status": "construction",
   "start_year": 2025,
   "open_year": 2028,
   "power_mw_now": null,
   "power_mw_full": 2450,
   "full_build_date": "2028-12",
   "capex_bn_full": 66.3,
   "water_mgd": 0.02,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Project Jupiter Website",
     "u": "https://projectjupitertogether.com/"
    },
    {
     "t": "Oracle, BorderPlex and Bloom Energy to power Project Jupiter with fuel cell technology (Apr 27, 2026)",
     "u": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/"
    },
    {
     "t": "Stormwater Permitting",
     "u": "https://drive.google.com/file/d/1vVKvPogq2TkeFn7ibnp0GNqz8aB4tZXz/view?usp=sharing"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2025": [
     "c",
     0
    ],
    "2026": [
     "c",
     0
    ],
    "2027": [
     "c",
     0
    ],
    "2028": [
     "o",
     2450
    ],
    "2029": [
     "o",
     2450
    ],
    "2030": [
     "o",
     2450
    ]
   }
  },
  {
   "id": "openai-stargate-shackelford",
   "name": "OpenAI Stargate Shackelford",
   "operator": "Oracle",
   "users": "OpenAI",
   "project": "Stargate",
   "lat": 32.7089,
   "lng": -99.3308,
   "loc_precision": "city/county",
   "place": "175 Private Road 1604, Abilene, TX 79601, Shackelford County",
   "state": "Texas",
   "country": "United States",
   "status": "construction",
   "start_year": 2025,
   "open_year": 2027,
   "power_mw_now": null,
   "power_mw_full": 1960,
   "full_build_date": "2028-11",
   "capex_bn_full": 53.0,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Vantage data center page with power capacity, number of buildings, and first building timeline",
     "u": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx"
    },
    {
     "t": "OpenAI Stargate expansion announcement mentioning Shackelford site",
     "u": "https://openai.com/index/five-new-stargate-sites/"
    },
    {
     "t": "Vantage LinkedIn post connecting the data center to OpenAI Stargate",
     "u": "https://web.archive.org/web/20260226203340/https://www.linkedin.com/posts/vantage-data-centers_ai-digitalinfrastructure-stargate-activity-7405254667062124544-FOcd/?rcm=ACoAAAmuuF4BvsgagH4Z8-Z8-0LaBPPY6467cAs"
    },
    {
     "t": "TDLR filing for first building (other buildings are also on TDLR)",
     "u": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026024094"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2025": [
     "c",
     0
    ],
    "2026": [
     "c",
     0
    ],
    "2027": [
     "o",
     588
    ],
    "2028": [
     "o",
     1960
    ],
    "2029": [
     "o",
     1960
    ],
    "2030": [
     "o",
     1960
    ]
   }
  },
  {
   "id": "openai-stargate-uae",
   "name": "OpenAI Stargate UAE",
   "operator": "G42",
   "users": "OpenAI",
   "project": "Stargate",
   "lat": 23.65,
   "lng": 53.7,
   "loc_precision": "region",
   "place": "Nexus L&T Project Office, Al Bihouth, Al Dhafrah, Abu Dhabi, United Arab Emirates",
   "state": "",
   "country": "United Arab Emirates",
   "status": "construction",
   "start_year": 2025,
   "open_year": 2026,
   "power_mw_now": null,
   "power_mw_full": 1400,
   "full_build_date": "2028-01",
   "capex_bn_full": 37.9,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "News update with timelapse of construction",
     "u": "https://www.khaleejtimes.com/uae/stargate-uae-phase-1-in-two-years"
    },
    {
     "t": "Announcement of the (separate) 100 MW Khazna Ajman data center",
     "u": "https://khaznadatacenters.com/press-release/khazna-announces-the-uaes-first-ai-optimized-data-center-and-the-largest-in-its-portfolio-powering-the-nations-drive-toward-ai-leadership/"
    },
    {
     "t": "News about the US approval of NVIDIA chips in the UAE",
     "u": "https://www.bloomberg.com/news/articles/2025-10-09/us-approves-several-billion-dollars-of-nvidia-nvda-ai-chip-sales-to-uae"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     280
    ],
    "2027": [
     "o",
     280
    ],
    "2028": [
     "o",
     1400
    ],
    "2029": [
     "o",
     1400
    ],
    "2030": [
     "o",
     1400
    ]
   }
  },
  {
   "id": "openai-stargate-wisconsin",
   "name": "OpenAI Stargate Wisconsin",
   "operator": "Oracle",
   "users": "OpenAI",
   "project": "Stargate",
   "lat": 43.3886,
   "lng": -87.8693,
   "loc_precision": "city/county",
   "place": "Port Washington, Wisconsin",
   "state": "Wisconsin",
   "country": "United States",
   "status": "construction",
   "start_year": 2026,
   "open_year": 2028,
   "power_mw_now": null,
   "power_mw_full": 1300,
   "full_build_date": "2028-12",
   "capex_bn_full": 34.2,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "Data center page on Vantage website",
     "u": "https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin"
    },
    {
     "t": "Environmental Analysis Summary",
     "u": "https://drive.google.com/file/d/1ft2ZzqAYZtsTqMwyML4eo_EFYuclVxE6/view?usp=sharing"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2026": [
     "c",
     0
    ],
    "2027": [
     "c",
     0
    ],
    "2028": [
     "o",
     1300
    ],
    "2029": [
     "o",
     1300
    ],
    "2030": [
     "o",
     1300
    ]
   }
  },
  {
   "id": "qts-cedar-rapids",
   "name": "QTS Cedar Rapids",
   "operator": "Meta",
   "users": "Meta",
   "project": "",
   "lat": 41.9056,
   "lng": -91.7511,
   "loc_precision": "address",
   "place": "6200 76th Ave SW, Fairfax, IA 52228",
   "state": "Iowa",
   "country": "United States",
   "status": "construction",
   "start_year": 2025,
   "open_year": 2026,
   "power_mw_now": null,
   "power_mw_full": 1587,
   "full_build_date": "2027-11",
   "capex_bn_full": 42.9,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "MISO new load announcements",
     "u": "https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf"
    },
    {
     "t": "Article by The Gazette",
     "u": "https://www.thegazette.com/business/fast-start-to-cedar-rapids-data-center-projects/"
    },
    {
     "t": "Article by Corridor Business Journal ",
     "u": "https://corridorbusiness.com/scope-of-qts-data-project-in-cedar-rapids-continuing-to-grow/"
    },
    {
     "t": "Post by GLD Commercial ",
     "u": "https://www.gldcommercial.com/google-and-qts-data/"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     627
    ],
    "2027": [
     "o",
     1587
    ],
    "2028": [
     "o",
     1587
    ],
    "2029": [
     "o",
     1587
    ],
    "2030": [
     "o",
     1587
    ]
   }
  },
  {
   "id": "qts-eagle-mountain",
   "name": "QTS Eagle Mountain",
   "operator": "Meta",
   "users": "Meta",
   "project": "",
   "lat": 40.2689,
   "lng": -112.0343,
   "loc_precision": "address",
   "place": "652 E Hyperscale Way, Eagle Mountain, UT 84013",
   "state": "Utah",
   "country": "United States",
   "status": "construction",
   "start_year": 2023,
   "open_year": 2026,
   "power_mw_now": null,
   "power_mw_full": 411,
   "full_build_date": "2027-07",
   "capex_bn_full": 11.5,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "notes": "",
   "basis": "epoch",
   "sources": [
    {
     "t": "QTS Eagle Mountain website",
     "u": "https://q.com/data-centers/eagle-mountain/"
    },
    {
     "t": "DEQ Approval listing emergency generators",
     "u": "https://daqpermitting.utah.gov/DocViewer?IntDocID=155764&contentType=application/pdf"
    },
    {
     "t": "Epoch AI, Frontier Data Centers (CC BY 4.0)",
     "u": "https://epoch.ai/data/ai-data-centers"
    }
   ],
   "years": {
    "2023": [
     "c",
     0
    ],
    "2024": [
     "c",
     0
    ],
    "2025": [
     "c",
     0
    ],
    "2026": [
     "o",
     274
    ],
    "2027": [
     "o",
     411
    ],
    "2028": [
     "o",
     411
    ],
    "2029": [
     "o",
     411
    ],
    "2030": [
     "o",
     411
    ]
   }
  },
  {
   "id": "loudoun-county-data-center-alley",
   "users": "",
   "project": "",
   "lat": 39.0298,
   "lng": -77.4744,
   "loc_precision": "approximate",
   "place": "Ashburn, Virginia",
   "country": "United States",
   "start_year": null,
   "open_year": null,
   "power_mw_now": null,
   "power_mw_full": null,
   "full_build_date": null,
   "capex_bn_full": null,
   "water_mgd": null,
   "sqft": 58300000,
   "acres": null,
   "cooling": null,
   "cost_reported": null,
   "basis": "reported",
   "years": {
    "2018": [
     "o",
     0
    ],
    "2019": [
     "o",
     0
    ],
    "2020": [
     "o",
     0
    ],
    "2021": [
     "o",
     0
    ],
    "2022": [
     "o",
     0
    ],
    "2023": [
     "o",
     0
    ],
    "2024": [
     "o",
     0
    ],
    "2025": [
     "o",
     0
    ],
    "2026": [
     "o",
     0
    ],
    "2027": [
     "o",
     0
    ],
    "2028": [
     "o",
     0
    ],
    "2029": [
     "o",
     0
    ],
    "2030": [
     "o",
     0
    ]
   },
   "name": "Loudoun County \"Data Center Alley\"",
   "operator": "Many operators (county total)",
   "status": "operating",
   "state": "Virginia",
   "notes": "One marker for the whole county. About 245 data center buildings and 58.3 million sq ft built or under construction as of Sept. 1, 2026. Data centers paid $1.2 billion in property taxes in FY2026, 39% of the county budget.",
   "sources": [
    {
     "t": "Loudoun County: Data Centers, The Loudoun Story",
     "u": "https://www.loudoun.gov/6408/Data-Centers-The-Loudoun-Story"
    }
   ],
   "cluster": true
  },
  {
   "id": "prince-william-digital-gateway",
   "users": "",
   "project": "",
   "lat": 38.7927,
   "lng": -77.6292,
   "loc_precision": "approximate",
   "place": "Gainesville, Virginia",
   "country": "United States",
   "start_year": 2022,
   "open_year": null,
   "power_mw_now": null,
   "power_mw_full": null,
   "full_build_date": null,
   "capex_bn_full": null,
   "water_mgd": null,
   "sqft": 23000000,
   "acres": 2100,
   "cooling": null,
   "cost_reported": null,
   "basis": "reported",
   "years": {
    "2022": [
     "p",
     0
    ],
    "2023": [
     "p",
     0
    ],
    "2024": [
     "p",
     0
    ],
    "2025": [
     "p",
     0
    ],
    "2026": [
     "b",
     0
    ],
    "2027": [
     "b",
     0
    ],
    "2028": [
     "b",
     0
    ],
    "2029": [
     "b",
     0
    ],
    "2030": [
     "b",
     0
    ]
   },
   "name": "Prince William Digital Gateway",
   "operator": "QTS and others (proposed)",
   "status": "blocked",
   "state": "Virginia",
   "notes": "A proposed 23-million-sq-ft complex on 2,100 acres near Manassas National Battlefield Park. Courts voided the rezonings over defective public notice, and QTS dropped its last appeal in July 2026.",
   "sources": [
    {
     "t": "Virginia Business, July 6, 2026",
     "u": "https://virginiabusiness.com/prince-william-digital-gateway-data-center-project-officially-dies/"
    }
   ]
  },
  {
   "id": "project-blue-pima-county",
   "users": "",
   "project": "",
   "lat": 32.044,
   "lng": -110.7843,
   "loc_precision": "approximate",
   "place": "Pima County Fairgrounds, Arizona",
   "country": "United States",
   "start_year": 2025,
   "open_year": 2028,
   "power_mw_now": null,
   "power_mw_full": null,
   "full_build_date": null,
   "capex_bn_full": null,
   "water_mgd": null,
   "sqft": null,
   "acres": 290,
   "cooling": null,
   "cost_reported": null,
   "basis": "reported",
   "years": {
    "2025": [
     "c",
     0
    ],
    "2026": [
     "c",
     0
    ],
    "2027": [
     "c",
     0
    ],
    "2028": [
     "o",
     0
    ],
    "2029": [
     "o",
     0
    ],
    "2030": [
     "o",
     0
    ]
   },
   "name": "Project Blue (Pima County)",
   "operator": "Beale Infrastructure",
   "status": "construction",
   "state": "Arizona",
   "notes": "Tucson's mayor and council voted unanimously to stop the project inside the city. It moved ahead on county land: a 10-building campus on 290 acres, with about 180 jobs, expected to open by 2028. Site work began in April 2026.",
   "sources": [
    {
     "t": "KOLD 13 News, April 24, 2026",
     "u": "https://www.kold.com/2026/04/25/construction-begins-first-hyper-scale-data-center-pima-county/"
    }
   ]
  },
  {
   "id": "project-marvel-bessemer",
   "users": "",
   "project": "",
   "lat": 33.4018,
   "lng": -86.9544,
   "loc_precision": "approximate",
   "place": "Bessemer, Alabama",
   "country": "United States",
   "start_year": 2025,
   "open_year": null,
   "power_mw_now": null,
   "power_mw_full": 1200,
   "full_build_date": null,
   "capex_bn_full": null,
   "water_mgd": null,
   "sqft": null,
   "acres": 1614,
   "cooling": null,
   "cost_reported": "$14.5 billion",
   "basis": "reported",
   "years": {
    "2025": [
     "p",
     0
    ],
    "2026": [
     "p",
     0
    ],
    "2027": [
     "p",
     0
    ],
    "2028": [
     "p",
     0
    ],
    "2029": [
     "p",
     0
    ],
    "2030": [
     "p",
     0
    ]
   },
   "name": "Project Marvel (Bessemer)",
   "operator": "Logistic Land Investment LLC (end user not disclosed)",
   "status": "proposed",
   "state": "Alabama",
   "notes": "$14.5 billion planned investment. 700 acres rezoned in Nov. 2025 on a 5-2 vote, then 914 more acres in April 2026. Developer cited about 1.2 GW of power confirmed by Alabama Power, 330 permanent jobs, and 1,000 construction jobs.",
   "sources": [
    {
     "t": "WBRC, Nov. 18, 2025",
     "u": "https://www.wbrc.com/2025/11/19/bessemer-city-council-approves-149-billion-data-center-project-despite-transparency-concerns/"
    },
    {
     "t": "ABC 33/40, April 21, 2026",
     "u": "https://abc3340.com/news/local/alabama-bessemer-approves-rezoning-of-914-acres-for-project-marvel-data-center-april-2026"
    }
   ]
  },
  {
   "id": "ports-pike-technology-campus",
   "users": "",
   "project": "",
   "lat": 39.0681,
   "lng": -83.0143,
   "loc_precision": "approximate",
   "place": "Piketon, Ohio",
   "country": "United States",
   "start_year": 2026,
   "open_year": 2028,
   "power_mw_now": null,
   "power_mw_full": 8000,
   "full_build_date": null,
   "capex_bn_full": null,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": "Closed-loop, air-cooled (company statement)",
   "cost_reported": null,
   "basis": "reported",
   "years": {
    "2026": [
     "p",
     0
    ],
    "2027": [
     "p",
     0
    ],
    "2028": [
     "o",
     0
    ],
    "2029": [
     "o",
     0
    ],
    "2030": [
     "o",
     0
    ]
   },
   "name": "PORTS-Pike Technology Campus",
   "operator": "SB Energy (for OpenAI)",
   "status": "proposed",
   "state": "Ohio",
   "notes": "OpenAI agreed to lease about 8 GW of IT capacity at the former Portsmouth uranium enrichment site. The first 800 MW is expected in 2028. Closed-loop, air-cooled design. OpenAI cites 35,000 construction jobs and 2,500 operating jobs. Later phases need new gas plants and transmission lines.",
   "sources": [
    {
     "t": "OpenAI, Aug. 17, 2026",
     "u": "https://openai.com/index/openai-joins-ports-pike-project/"
    }
   ]
  },
  {
   "id": "project-camellia",
   "users": "",
   "project": "",
   "lat": 32.342,
   "lng": -81.3387,
   "loc_precision": "approximate",
   "place": "Effingham County, Georgia",
   "country": "United States",
   "start_year": 2026,
   "open_year": 2028,
   "power_mw_now": null,
   "power_mw_full": 3200,
   "full_build_date": null,
   "capex_bn_full": null,
   "water_mgd": null,
   "sqft": null,
   "acres": null,
   "cooling": "Closed-loop (company statement)",
   "cost_reported": "$20 billion (county figure, via AJC)",
   "basis": "reported",
   "years": {
    "2026": [
     "p",
     0
    ],
    "2027": [
     "p",
     0
    ],
    "2028": [
     "o",
     0
    ],
    "2029": [
     "o",
     0
    ],
    "2030": [
     "o",
     0
    ]
   },
   "name": "Project Camellia",
   "operator": "OpenAI",
   "status": "proposed",
   "state": "Georgia",
   "notes": "OpenAI is contracting 3.2 GW from Georgia Power, delivered in phases from 2028 to 2032, and says it can cut up to 1,000 MW during grid stress. Closed-loop cooling. OpenAI pledged $80 million in community benefits.",
   "sources": [
    {
     "t": "OpenAI, July 22, 2026",
     "u": "https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/"
    },
    {
     "t": "Georgia Power release",
     "u": "https://www.georgiapower.com/news-hub/press-releases/contract-openai-approved-part-portfolio-delivering-950-million-annual-savings.html"
    },
    {
     "t": "Atlanta Journal-Constitution, Aug. 2026",
     "u": "https://www.ajc.com/business/2026/08/georgia-power-deal-to-serve-20b-openai-data-center-under-regulators-microscope/"
    }
   ]
  }
 ]
}